IN THE MATTER OF THE APPLICATION FOR APPROVAL OF: A.) MAXIMUM AVERAGE PRICE (MAP) FOR THE REGULATORY YEAR 2013; AND B.) TRANSLATION OF THE MAXIMUM AVERAGE PRICE FOR REGULATORY YEAR 2013 (RY2013) INTO DISTRIBUTION RATES FOR ITS VARIOUS CUSTOMER CLASSES, WITH PRAYER FOR THE ISSUANCE OF A PROVISIONAL AUTHORITY

April 30, 2012

In compliance with the Energy Regulatory Commission's Order dated 23 April 2012 requiring MERALCO to inform its consumers within its franchise area, by any other means available and appropriate, of the filing of the instant Application, its reasons therefor, and of the scheduled hearing in ERC Case No. 2012-054 RC entitled, "IN THE MATTER OF THE APPLICATION FOR APPROVAL OF: A.) MAXIMUM AVERAGE PRICE (MAP) FOR THE REGULATORY YEAR 2013; AND B.) TRANSLATION OF THE MAXIMUM AVERAGE PRICE FOR REGULATORY YEAR 2013 (RY2013) INTO DISTRIBUTION RATES FOR ITS VARIOUS CUSTOMER CLASSES, WITH PRAYER FOR THE ISSUANCE OF A PROVISIONAL AUTHORITY,"


IN THE MATTER OF THE APPLICATION FOR APPROVAL OF THE POWER SUPPLY AGREEMENT (PSA) BETWEEN MANILA ELECTRIC COMPANY (MERALCO) AND THERMA LUZON, INC. (TLI)

April 30, 2012

In compliance with the Energy Regulatory Commission's Order dated 23 April 2012 requiring MERALCO to inform its consumers within its franchise area, by any other means available and appropriate, of the filing of the instant Application, its reasons therefor, and of the scheduled hearing in ERC Case No. 2012-035 RC entitled, "IN THE MATTER OF THE APPLICATION FOR APPROVAL OF THE POWER SUPPLY AGREEMENT (PSA) BETWEEN MANILA ELECTRIC COMPANY (MERALCO) AND THERMA LUZON, INC. (TLI),"


IN THE MATTER OF THE APPLICATION FOR APPROVAL OF THE POWER SUPPLY AGREEMENT (PSA) BETWEEN MANILA ELECTRIC COMPANY (MERALCO) AND SEM-CALACA POWER CORPORATION (SCPC), WITH PRAYER FOR PROVISIONAL AUTHORITY

April 20, 2012

In compliance with the Energy Regulatory Commission's Order dated 12 April 2012 requiring MERALCO to inform its customers within its franchise area, by any other means available and appropriate, of the filing of the instant Application, its reasons therefor, and of the scheduled hearing in ERC Case No. 2012-037 RC entitled, "IN THE MATTER OF THE APPLICATION FOR APPROVAL OF THE POWER SUPPLY AGREEMENT (PSA) BETWEEN MANILA ELECTRIC COMPANY (MERALCO) AND SEM-CALACA POWER CORPORATION (SCPC), WITH PRAYER FOR PROVISIONAL AUTHORITY,"


IN THE MATTER OF THE APPLICATION FOR AUTHORITY TO SUBSTITUTE VARIOUS APPROVED THIRD REGULATORY PERIOD CAPITAL EXPENDITURE PROJECTS WITH THE IMPLEMENTATION SERVICES OF PREPAID ELECTRICITY MANAGEMENT SYSTEM (IS-PEMS) PROJECT, WITH URGENT PRAYER FOR PROVISIONAL AUTHORITY, Manila Electric Company (MERALCO), Applicant

March 27, 2012

In compliance with the Energy Regulatory Commission's Order dated 22 March 2012 requiring MERALCO to inform its customers within its franchise area, by any other means available and appropriate, of the filing of the instant Application, its reasons therefor, and of the scheduled hearing in ERC Case No. 2012-033 RC entitled, "IN THE MATTER OF THE APPLICATION FOR AUTHORITY TO SUBSTITUTE VARIOUS APPROVED THIRD REGULATORY PERIOD CAPITAL EXPENDITURE PROJECTS WITH THE IMPLEMENTATION SERVICES OF PREPAID ELECTRICITY MANAGEMENT SYSTEM (IS-PEMS) PROJECT, WITH URGENT PRAYER FOR PROVISIONAL AUTHORITY, Manila Electric Company (MERALCO), Applicant,"


IN THE MATTER OF THE APPLICATION FOR AUTHORITY TO IMPLEMENT AND COLLECT THE LOCAL FRANCHISE TAX (LFT) RATE IN THE CITY OF BIÑAN, LAGUNA, WITH PRAYER FOR PROVISIONAL AUTHORITY, Manila Electric Company (MERALCO), Applicant

February 2, 2012

In compliance with the Energy Regulatory Commission's Order dated 24 January 2012 requiring MERALCO to inform its customers within its franchise area, by any other means available and appropriate, of the filing of the instant Application, its reasons therefor, and of the scheduled hearing in ERC Case No. 2011-067 CF entitled, "IN THE MATTER OF THE APPLICATION FOR AUTHORITY TO IMPLEMENT AND COLLECT THE LOCAL FRANCHISE TAX (LFT) RATE IN THE CITY OF BIÑAN, LAGUNA, WITH PRAYER FOR PROVISIONAL AUTHORITY, Manila Electric Company (MERALCO), Applicant,"


IN THE MATTER OF THE APPLICATION FOR AUTHORITY TO COLLECT LOCAL FRANCHISE TAX (LFT) RATE IN THE CITY OF ANTIPOLO, WITH PRAYER FOR PROVISIONAL AUTHORITY, Manila Electric Company (MERALCO), Applicant

February 2, 2012

In compliance with the Energy Regulatory Commission's Order dated 24 January 2012 requiring MERALCO to inform its customers within its franchise area, by any other means available and appropriate, of the filing of the instant Application, its reasons therefor, and of the scheduled hearing in ERC Case No. 2011-066 CF entitled, "IN THE MATTER OF THE APPLICATION FOR AUTHORITY TO COLLECT LOCAL FRANCHISE TAX (LFT) RATE IN THE CITY OF ANTIPOLO, WITH PRAYER FOR PROVISIONAL AUTHORITY, Manila Electric Company (MERALCO), Applicant,"


IN THE MATTER OF THE APPLICATION FOR AUTHORITY TO COLLECT LOCAL FRANCHISE TAX (LFT) RATE IN THE CITY OF DASMARIÑAS, WITH PRAYER FOR PROVISIONAL AUTHORITY, Manila Electric Company (MERALCO), Applicant

February 2, 2012

In compliance with the Energy Regulatory Commission's Order dated 24 January 2012 requiring MERALCO to inform its customers within its franchise area, by any other means available and appropriate, of the filing of the instant Application, its reasons therefor, and of the scheduled hearing in ERC Case No. 2011-068 CF entitled, "IN THE MATTER OF THE APPLICATION FOR AUTHORITY TO COLLECT LOCAL FRANCHISE TAX (LFT) RATE IN THE CITY OF DASMARIÑAS, WITH PRAYER FOR PROVISIONAL AUTHORITY, Manila Electric Company (MERALCO), Applicant,"


IN THE MATTER OF THE APPLICATION TO CONFIRM THE GENERATION RATE OVER/UNDER RECOVERY (GOUR); TRANSMISSION RATE OVER/UNDER RECOVERY (TOUR); SYSTEM LOSS OVER/UNDER RECOVERY (SLOUR); AND LIFELINE SUBSIDY OVER/UNDER RECOVERY (LSOUR); AND FOR AUTHORITY TO REFUND/RECOVER CONFIRMED OVER/UNDER RECOVERIES, WITH PRAYER FOR PROVISIONAL AUTHORITY

January 6, 2012

In compliance with the Energy Regulatory Commission's Order dated 02 January 2012 requiring MERALCO to inform its customers within its franchise area, by any other means available and appropriate, of the filing of the instant Supplemental Application, its reasons therefor, and of the scheduled hearing in ERC Case No. 2011-010 CF entitled, "IN THE MATTER OF THE APPLICATION TO CONFIRM THE GENERATION RATE OVER/UNDER RECOVERY (GOUR); TRANSMISSION RATE OVER/UNDER RECOVERY (TOUR); SYSTEM LOSS OVER/UNDER RECOVERY (SLOUR); AND LIFELINE SUBSIDY OVER/UNDER RECOVERY (LSOUR); AND FOR AUTHORITY TO REFUND/RECOVER CONFIRMED OVER/UNDER RECOVERIES, WITH PRAYER FOR PROVISIONAL AUTHORITY, Manila Electric Company (MERALCO), Applicant,"



2011 ERC Postings


IN THE MATTER OF THE APPLICATION FOR THE APPROVAL AND RECOVERY OF GENERATION COST UNDER THE SECOND GENERATION RATE ADJUSTMENT MECHANISM (2ND GRAM), TOGETHER WITH CARRYING CHARGES, WITH PRAYER FOR PROVISIONAL AUTHORITY

August 22, 2011

In compliance with the Energy Regulatory Commission's Order dated July 25, 2011 requiring MERALCO to inform its customers within its franchise area, by any other means available and appropriate, of the filing of the instant application, its reasons therefor, and of the scheduled hearing in ERC Case No. 2010-135 RC entitled, "IN THE MATTER OF THE APPLICATION FOR THE APPROVAL AND RECOVERY OF GENERATION COST UNDER THE SECOND GENERATION RATE ADJUSTMENT MECHANISM (2ND GRAM), TOGETHER WITH CARRYING CHARGES, WITH PRAYER FOR PROVISIONAL AUTHORITY,"


IN THE MATTER OF THE APPLICATION FOR APPROVAL OF: A.) MAXIMUM AVERAGE PRICE (MAP) FOR THE REGULATORY YEAR 2012; AND B.) TRANSLATION OF THE MAXIMUM AVERAGE PRICE FOR THE REGULATORY YEAR 2012 (RY2012) INTO A DISTRIBUTION RATE STRUCTURE FOR MERALCO'S VARIOUS CUSTOMER CLASSES, WITH PRAYER FOR THE ISSUANCE OF A PROVISIONAL AUTHORITY

August 18, 2011

In compliance with the Energy Regulatory Commission's Order dated August 8, 2011 requiring MERALCO to inform its customers within its franchise area, by any other means available and appropriate, of the filing of the instant application, its reasons therefor, and the scheduled hearing in ERC Case No. 2011-088 RC entitled, "IN THE MATTER OF THE APPLICATION FOR APPROVAL OF: A.) MAXIMUM AVERAGE PRICE (MAP) FOR THE REGULATORY YEAR 2012; AND B.) TRANSLATION OF THE MAXIMUM AVERAGE PRICE FOR THE REGULATORY YEAR 2012 (RY2012) INTO A DISTRIBUTION RATE STRUCTURE FOR MERALCO'S VARIOUS CUSTOMER CLASSES, WITH PRAYER FOR THE ISSUANCE OF A PROVISIONAL AUTHORITY,"


IN THE MATTER OF THE APPLICATION FOR THE APPROVAL OF THE CONNECTION AGREEMENT AND DISTRIBUTION WHEELING SERVICE AGREEMENT, TOGETHER WITH THE ATTACHED RATE SCHEDULES, BETWEEN MERALCO AND EAGLE CEMENT CORPORATION, PURSUANT TO ERC RESOLUTION NO. 1, SERIES OF 2009, WITH PRAYER FOR PROVISIONAL AUTHORITY

August 11, 2011

In compliance with the Energy Regulatory Commission's Order dated July 27, 2011 requiring MERALCO to inform its customers within its franchise area, by any other means available and appropriate, of the filing of the instant application, its reasons therefor, and of the scheduled hearing in ERC Case No. 2010-089 RC entitled, "IN THE MATTER OF THE APPLICATION FOR THE APPROVAL OF THE CONNECTION AGREEMENT AND DISTRIBUTION WHEELING SERVICE AGREEMENT, TOGETHER WITH THE ATTACHED RATE SCHEDULES, BETWEEN MERALCO AND EAGLE CEMENT CORPORATION, PURSUANT TO ERC RESOLUTION NO. 1, SERIES OF 2009, WITH PRAYER FOR PROVISIONAL AUTHORITY,"


IN THE MATTER OF THE APPLICATION FOR THE APPROVAL OF THE CONNECTION AGREEMENT (CA) AND DISTRIBUTION WHEELING SERVICE AGREEMENT (DWSA), TOGETHER WITH THE ATTACHED RATE SCHEDULE, BETWEEN MANILA ELECTRIC COMPANY (MERALCO) AND SOLID DEVELOPMENT CORPORATION (AS DULY REPRESENTED BY TEAM PHILIPPINES ENERGY CORPORATION) AND MERALCO AND TEAM PHILIPPINES ENERGY CORPORATION, RESPECTIVELY, WITH PRAYER FOR PROVISIONAL AUTHORITY

August 1, 2011

In compliance with the Energy Regulatory Commission's Order dated July 22, 2011 requiring MERALCO to inform its customers within its franchise area, by any other means available and appropriate, of the filing of the instant application, its reasons therefor, and of the scheduled hearing in ERC Case No. 2011-070 RC entitled, "IN THE MATTER OF THE APPLICATION FOR THE APPROVAL OF THE CONNECTION AGREEMENT (CA) AND DISTRIBUTION WHEELING SERVICE AGREEMENT (DWSA), TOGETHER WITH THE ATTACHED RATE SCHEDULE, BETWEEN MANILA ELECTRIC COMPANY (MERALCO) AND SOLID DEVELOPMENT CORPORATION (AS DULY REPRESENTED BY TEAM PHILIPPINES ENERGY CORPORATION) AND MERALCO AND TEAM PHILIPPINES ENERGY CORPORATION, RESPECTIVELY, WITH PRAYER FOR PROVISIONAL AUTHORITY,"


IN THE MATTER OF THE APPLICATION FOR APPROVAL OF THE POWER SUPPLY AGREEMENT (PSA) BETWEEN SOUTH PREMIERE POWER CORPORATION (SPPC) AND MANILA ELECTRIC COMPANY (MERALCO), WITH PRAYER FOR PROVISIONAL AUTHORITY

August 1, 2011

In compliance with the Energy Regulatory Commission's Order dated July 22, 2011 requiring MERALCO to inform its customers within its franchise area, by any other means available and appropriate, of the filing of the instant application, its reasons therefor, and of the scheduled hearing in ERC Case No. 2011-098 RC entitled, "IN THE MATTER OF THE APPLICATION FOR APPROVAL OF THE POWER SUPPLY AGREEMENT (PSA) BETWEEN SOUTH PREMIERE POWER CORPORATION (SPPC) AND MANILA ELECTRIC COMPANY (MERALCO), WITH PRAYER FOR PROVISIONAL AUTHORITY,"


IN THE MATTER OF THE APPLICATION FOR APPROVAL OF THE RATE SCHEDULES AND APPRAISAL OF PROPERTIES, WITH PRAYER FOR PROVISIONAL AUTHORITY, MANILA ELECTRIC COMPANY (MERALCO), Applicant

July 28, 2011

Pursuant to the Energy Regulatory Commission's Order extending the implementation of the SC Refund up to December 31, 2015 in ERC Case No. 2001-243 (ERB Case No. 93-118) entitled, "IN THE MATTER OF THE APPLICATION FOR APPROVAL OF THE RATE SCHEDULES AND APPRAISAL OF PROPERTIES, WITH PRAYER FOR PROVISIONAL AUTHORITY, MANILA ELECTRIC COMPANY (MERALCO), Applicant,"


IN THE MATTER OF THE APPLICATION TO CONFIRM THE GENERATION RATE OVER/UNDER RECOVERY (GOUR); TRANSMISSION RATE OVER/UNDER RECOVERY (TOUR); SYSTEM LOSS OVER/UNDER RECOVERY (SLOUR); AND LIFELINE SUBSIDY OVER/UNDER RECOVERY (LSOUR); AND FOR AUTHORITY TO REFUND/RECOVER CONFIRMED OVER/UNDER RECOVERIES, WITH PRAYER FOR PROVISIONAL AUTHORITY, Manila Electric Company (MERALCO), Applicant.

July 26, 2011

In compliance with the Energy Regulatory Commission's Order dated July 11, 2011 requiring MERALCO to inform its customers within its franchise area, by any other means available and appropriate, of the filing of the instant application, its reasons therefor, and of the scheduled hearing in ERC Case No. 2011-010 CF entitled, "IN THE MATTER OF THE APPLICATION TO CONFIRM THE GENERATION RATE OVER/UNDER RECOVERY (GOUR); TRANSMISSION RATE OVER/UNDER RECOVERY (TOUR); SYSTEM LOSS OVER/UNDER RECOVERY (SLOUR); AND LIFELINE SUBSIDY OVER/UNDER RECOVERY (LSOUR); AND FOR AUTHORITY TO REFUND/RECOVER CONFIRMED OVER/UNDER RECOVERIES, WITH PRAYER FOR PROVISIONAL AUTHORITY, Manila Electric Company (MERALCO), Applicant".


IN THE MATTER OF THE APPLICATION FOR AUTHORITY TO IMPLEMENT AND COLLECT THE LOCAL FRANCHISE TAX RATE IN THE CITY OF LUCENA, QUEZON, WITH PRAYER FOR PROVISIONAL AUTHORITY, Manila Electric Company (MERALCO), Applicant

June 2, 2011

In compliance with the Energy Regulatory Commission's Order dated May 23, 2011 requiring MERALCO to inform its customers of the scheduled hearing in ERC Case No. 2011-044 RC entitled, "IN THE MATTER OF THE APPLICATION FOR AUTHORITY TO IMPLEMENT AND COLLECT THE LOCAL FRANCHISE TAX RATE IN THE CITY OF LUCENA, QUEZON, WITH PRAYER FOR PROVISIONAL AUTHORITY, Manila Electric Company (MERALCO), Applicant,"


IN THE MATTER OF THE APPLICATION FOR AUTHORITY TO RECOVER THE LOCAL FRANCHISE TAX (LFT) PAID TO BULACAN PROVINCE, BATANGAS PROVINCE, CAVITE PROVINCE, LAGUNA PROVINCE, RIZAL PROVINCE, SAN JOSE DEL MONTE CITY, BATANGAS CITY, SAN PABLO CITY, TAGAYTAY CITY, LUCENA CITY, MANDALUYONG CITY, MARIKINA CITY, QUEZON CITY, CALOOCAN CITY, PASAY CITY, LAS PIÑAS CITY, CITY OF MANILA, PASIG CITY, AND CALAMBA CITY, WITH PRAYER FOR PROVISIONAL AUTHORITY, Manila Electric Company (MERALCO), Applicant

June 2, 2011

In compliance with the Energy Regulatory Commission's Order dated May 23, 2011 requiring MERALCO to inform its customers of the scheduled hearing in ERC Case No. 2011-045 RC entitled, "IN THE MATTER OF THE APPLICATION FOR AUTHORITY TO RECOVER THE LOCAL FRANCHISE TAX (LFT) PAID TO BULACAN PROVINCE, BATANGAS PROVINCE, CAVITE PROVINCE, LAGUNA PROVINCE, RIZAL PROVINCE, SAN JOSE DEL MONTE CITY, BATANGAS CITY, SAN PABLO CITY, TAGAYTAY CITY, LUCENA CITY, MANDALUYONG CITY, MARIKINA CITY, QUEZON CITY, CALOOCAN CITY, PASAY CITY, LAS PIÑAS CITY, CITY OF MANILA, PASIG CITY, AND CALAMBA CITY, WITH PRAYER FOR PROVISIONAL AUTHORITY, Manila Electric Company (MERALCO), Applicant,"


In the Matter of the Petition for the Amendment of the Guidelines to the Sale and Transfer of TRANSCO’s Subtransmission Assets and the Franchising of Qualified Consortiums, Private Electric Power Operators Association, Inc. (PEPOA) and Manila Electric Company (MERALCO), Petitioners

May 5, 2011

In compliance with the Energy Regulatory Commission's Order dated April 25, 2011 requiring MERALCO to inform its customers of the scheduled hearing in ERC CASE NO. 2010-012 RM entitled: "In the Matter of the Petition for the Amendment of the Guidelines to the Sale and Transfer of TRANSCO's Subtransmission Assets and the Franchising of Qualified Consortiums, Private Electric Power Operators Association, Inc. (PEPOA) and Manila Electric Company (MERALCO), Petitioners"


IN THE MATTER OF THE APPLICATION FOR AUTHORITY TO ISSUE BONDS OR EVIDENCE OF INDEBTEDNESS NOT TO EXCEED THE 50% LONG-TERM DEBT TO EQUITY RATIO, WITH PRAYER FOR PROVISIONAL AUTHORITY, Manila Electric Company (MERALCO), Applicant

March 4, 2011

In compliance with the Energy Regulatory Commission's Order dated February 28, 2011 requiring MERALCO to inform its customers of the scheduled hearing in ERC Case No. 2011-007 MC entitled, "IN THE MATTER OF THE APPLICATION FOR AUTHORITY TO ISSUE BONDS OR EVIDENCE OF INDEBTEDNESS NOT TO EXCEED THE 50% LONG-TERM DEBT TO EQUITY RATIO, WITH PRAYER FOR PROVISIONAL AUTHORITY, Manila Electric Company (MERALCO), Applicant,"


IN THE MATTER OF THE APPLICATION FOR APPROVAL OF THE CONTRACT FOR THE SUPPLY OF ELECTRICITY BETWEEN BACAVALLEY ENERGY INC. (BEI), AND MANILA ELECTRIC COMPANY (MERALCO), WITH PRAYER FOR PROVISIONAL AUTHORITY, Manila Electric Company (MERALCO), Applicant

February 9, 2011

In compliance with the Energy Regulatory Commission's Order dated February 7, 2011 requiring MERALCO to inform its customers of the scheduled hearing in ERC Case No. 2010-150 RC entitled, "IN THE MATTER OF THE APPLICATION FOR APPROVAL OF THE CONTRACT FOR THE SUPPLY OF ELECTRICITY BETWEEN BACAVALLEY ENERGY INC. (BEI), AND MANILA ELECTRIC COMPANY (MERALCO), WITH PRAYER FOR PROVISIONAL AUTHORITY, Manila Electric Company (MERALCO), Applicant,"


Application for Authority To Retire (1) The Cavite Substation located at Cavite City, (2) The Lucena II Substation located at Lucena City, Quezon Province, (3) Pagbilao Substation located at Pagbilao, Quezon Province, (4) Forbes Park Substation located at Makati City, And (5) Tondo Substation located at Tondo, Manila and to withdraw from service certain equipment and machinery installed in the Substations, with Prayer for Provincial Authority

January 19, 2011

In compliance with the Energy Regulatory Commission's Order dated January 10, 2011 requiring MERALCO to inform its customers of the scheduled hearing in ERC Case No. 2010-146 RC entitled, "IN THE MATTER OF THE APPLICATION FOR AUTHORITY TO RETIRE (1) THE CAVITE SUBSTATION LOCATED AT CAVITE CITY, (2) THE LUCENA II SUBSTATION LOCATED AT LUCENA CITY, QUEZON PROVINCE, (3) PAGBILAO SUBSTATION LOCATED AT PAGBILAO, QUEZON PROVINCE, (4) FORBES PARK SUBSTATION LOCATED AT MAKATI CITY, AND (5) TONDO SUBSTATION LOCATED AT TONDO, MANILA AND TO WITHDRAW FROM SERVICE CERTAIN EQUIPMENT AND MACHINERY INSTALLED IN THE SUBSTATIONS, WITH PRAYER FOR PROVISIONAL AUTHORITY, Manila Electric Company (MERALCO), Applicant,"


Application for Approval of the Annual Revenue Requirement and Performance Incentive Scheme for the Third Regulatory Period (2011 to 2015) in accordance with the Provisions of the Rules for Setting Distribution Wheeling Rates (RDWR)

January 13, 2011

In compliance with the Energy Regulatory Commission's Notice dated December 15, 2010 requiring MERALCO to inform its customers of the scheduled public consultation on the Draft Determination in ERC Case No. 2010-069 RC entitled, "In the Matter of the Application for Approval of the Annual Revenue Requirement and Performance Incentive Scheme for the Third Regulatory Period (2011 to 2015) in accordance with the Provisions of the Rules for Setting Distribution Wheeling Rates (RDWR), as Amended, Manila Electric Company (MERALCO), Applicant,"



2010 ERC Positngs

Application for approval of the annual revenue requirement and performance incentive scheme for the third regulatory period (2011 to 2015) in accordance with the provisions of the rules for setting distribution wheeling rates (RDWR). September 3, 2010

In compliance with the Energy Regulatory Commission's Order dated August 31, 2010 requiring MERALCO to inform its customers of the scheduled hearing in ERC Case No. 2010-069 RC entitled "IN THE MATTER OF THE APPLICATION FOR APPROVAL OF THE ANNUAL REVENUE REQUIREMENT AND PERFORMANCE INCENTIVE SCHEME FOR THE THIRD REGULATORY PERIOD (2011 TO 2015) IN ACCORDANCE WITH THE PROVISIONS OF THE RULES FOR SETTING DISTRIBUTION WHEELING RATES (RDWR), Manila Electric Company (MERALCO), Applicant,"

Application for Approval of the Agreement for the Supply of Electricity between the Manila Electric Company (MERALCO) and the Municipality of Norzagaray, Bulacan, Pursuant to ERC Resolution no. 1, Series of 2009, with Prayer for the Issuance of a Provisional Authority July 12, 2010

In compliance with the Energy Regulatory Commission's Order dated June 28, 2010 requiring MERALCO to inform its customers of the scheduled hearing in ERC Case No. 2010-035 RC entitled "IN THE MATTER OF THE APPLICATION FOR APPROVAL OF THE AGREEMENT FOR THE SUPPLY OF ELECTRICITY BETWEEN THE MANILA ELECTRIC COMPANY (MERALCO) AND THE MUNICIPALITY OF NORZAGARAY, BULACAN, PURSUANT TO ERC RESOLUTION NO. 1, SERIES OF 2009, WITH PRAYER FOR THE ISSUANCE OF A PROVISIONAL AUTHORITY, Manila Electric Company (MERALCO), Applicant,"

Application for Approval of the Annual Revenue Requirement and Performance Incentive Scheme for the Third Regulatory Period (2011 to 2015) in accordance with the Provisions of the Rules for Setting Distribution Wheeling Rates (RDWR) June 29, 2010

In compliance with the Energy Regulatory Commission's Order dated June 23, 2010 requiring MERALCO to inform its customers of the scheduled hearing in ERC Case No. 2010-069 RC entitled "In the Matter of the Application for Approval of the Annual Revenue Requirement and Performance Incentive Scheme for the Third Regulatory Period (2011 to 2015) in accordance with the Provisions of the Rules for Setting Distribution Wheeling Rates (RDWR), as Amended, Manila Electric Company (MERALCO), Applicant."

Application for Approval of: A.) Maximum Average Price (Map) for the Regulatory Year 2011; and B.) Translation of the Maximum Average Price for Regulatory Year 2011 (Ry2011) into a Distribution Rate Structure for its Various Customer Classes, With Prayer for the Issuance of a Provisional Authority May 12, 2010

In compliance with the Energy Regulatory Commission's Order dated May 5, 2010 requiring MERALCO to inform its customers of the scheduled hearing in ERC Case No. 2010-027 RC entitled "IN THE MATTER OF THE APPLICATION FOR APPROVAL OF: A.) MAXIMUM AVERAGE PRICE (MAP) FOR THE REGULATORY YEAR 2011; AND B.) TRANSLATION OF THE MAXIMUM AVERAGE PRICE FOR REGULATORY YEAR 2011 (RY2011) INTO A DISTRIBUTION RATE STRUCTURE FOR ITS VARIOUS CUSTOMER CLASSES, WITH PRAYER FOR THE ISSUANCE OF A PROVISIONAL AUTHORITY, Manila Electric Company (MERALCO), Applicant,"

Application for the Approval of the Agreement for the Supply of Electric Energy entered into by MERALCO with the National Irrigation Administration pursuant to ERC Resolution No. 1, Series of 2009, with Prayer for Provisional Authority March 31, 2010

In compliance with the Energy Regulatory Commission's Order dated March 24, 2010 requiring MERALCO to inform its customers of the scheduled hearing in ERC Case No. 2010-013 RC entitled "In the Matter of the Application for the Approval of the Agreement for the Supply of Electric Energy entered into by MERALCO with the National Irrigation Administration pursuant to ERC Resolution No. 1, Series of 2009, with Prayer for Provisional Authority, Manila Electric Company (MERALCO), Applicant".

Application for Authority to Retire the Morong Substation Located at Morong, Province of Rizal, the Gaya-Gaya Substation Located at San Jose Del Monte, Province of Bulacan and the Mauban Substation Located at Mauban, Province of Quezon, and to Withdraw from the Service Certain Equipment and Machinery Installed in the said Substations, with Prayer for Provisional Authority March 30, 2010

In compliance with the Energy Regulatory Commission's Order dated March 22, 2010 requiring MERALCO to inform its customers of the scheduled ocular inspection in ERC CASE NO. 2009-118 MC entitled: "APPLICATION FOR AUTHORITY TO RETIRE THE MORONG SUBSTATION LOCATED AT MORONG, PROVINCE OF RIZAL, THE GAYA-GAYA SUBSTATION LOCATED AT SAN JOSE DEL MONTE, PROVINCE OF BULACAN AND THE MAUBAN SUBSTATION LOCATED AT MAUBAN, PROVINCE OF QUEZON, AND TO WITHDRAW FROM THE SERVICE CERTAIN EQUIPMENT AND MACHINERY INSTALLED IN THE SAID SUBSTATIONS, WITH PRAYER FOR PROVISIONAL AUTHORITY, Manila Electric Company (MERALCO), Applicant".

Application for the Approval of the Sale of Various Subtransmission Lines/Assets of the National Transmission Corporation (TRANSCO) to Manila Electric Company (MERALCO), as Covered by a Contract to Sell, with Prayer for Provisional Authority March 30, 2010

In compliance with the Energy Regulatory Commission's Order dated March 22, 2010 requiring MERALCO to inform its customers of the scheduled ocular inspection in ERC CASE NO. 2009-174 RC entitled: "APPLICATION FOR THE APPROVAL OF THE SALE OF VARIOUS SUBTRANSMISSION LINES/ASSETS OF THE NATIONAL TRANSMISSION CORPORATION (TRANSCO) TO MANILA ELECTRIC COMPANY (MERALCO), AS COVERED BY A CONTRACT TO SELL, WITH PRAYER FOR PROVISIONAL AUTHORITY, Manila Electric Company (MERALCO), Applicant"

Petition for approval of a lower generation charge for billing month of March 2010 and for the recovery of the differential generation charge within a six (6)-month period, including the carrying cost, with prayer for Provisional Authority March 18, 2010

In compliance with the Energy Regulatory Commission's Order dated March 10, 2010 requiring MERALCO to inform its customers of the scheduled hearing in ERC CASE NO. 2010-017 RC entitled: "PETITION FOR APPROVAL OF A LOWER GENERATION CHARGE FOR BILLING MONTH OF MARCH 2010 AND FOR THE RECOVERY OF THE DIFFERENTIAL GENERATION CHARGE WITHIN A SIX (6)-MONTH PERIOD, INCLUDING THE CARRYING COST, WITH PRAYER FOR PROVISIONAL AUTHORITY, Manila Electric Company (MERALCO), Applicant"

Application for the Approval of the Sale of Various Subtransmission Lines/Assets of the National Transmission Corporation (TRANSCO) to Manila Electric Company (MERALCO), as Covered by a Contract to Sell, with Prayer for Provisional Authority February 26, 2010

In compliance with the Energy Regulatory Commission's Order dated February 15, 2010 requiring MERALCO to inform its customers of the scheduled hearing in ERC CASE NO. 2009-174 RC entitled: "APPLICATION FOR THE APPROVAL OF THE SALE OF VARIOUS SUBTRANSMISSION LINES/ASSETS OF THE NATIONAL TRANSMISSION CORPORATION (TRANSCO) TO MANILA ELECTRIC COMPANY (MERALCO), AS COVERED BY A CONTRACT TO SELL, WITH PRAYER FOR PROVISIONAL AUTHORITY, Manila Electric Company (MERALCO), Applicant"

Application for Authority to Retire the Morong Substation Located at Morong, Province of Rizal, the Gaya-Gaya Substation Located at San Jose Del Monte, Province of Bulacan and the Mauban Substation Located at Mauban, Province of Quezon, and to Withdraw from the Service Certain Equipment and Machinery Installed in the Said Substations, with Prayer for Provisional Authority February 25, 2010

In compliance with the Energy Regulatory Commission's Order dated February 15, 2010 requiring MERALCO to inform its customers of the scheduled hearing in ERC CASE NO. 2009-118 MC entitled: "APPLICATION FOR AUTHORITY TO RETIRE THE MORONG SUBSTATION LOCATED AT MORONG, PROVINCE OF RIZAL, THE GAYA-GAYA SUBSTATION LOCATED AT SAN JOSE DEL MONTE, PROVINCE OF BULACAN AND THE MAUBAN SUBSTATION LOCATED AT MAUBAN, PROVINCE OF QUEZON, AND TO WITHDRAW FROM THE SERVICE CERTAIN EQUIPMENT AND MACHINERY INSTALLED IN THE SAID SUBSTATIONS, WITH PRAYER FOR PROVISIONAL AUTHORITY, Manila Electric Company (MERALCO), Applicant".

2009 ERC Postings

Application for the Approval of the Agreement for the Supply of Electricity and Contract for Electric Service Entered into by MERALCO with NPC SPUG -LUZON and NPC SPUG -MQNL, Respectively, Pursuant to ERC Resolution No.1, Series of 2009, with Prayer for Provisional Authority December 22, 2009

In compliance with the Energy Regulatory Commission's Order dated December 15, 2009 requiring MERALCO to inform its customers of the scheduled hearing in ERC Case No. 2009-087 RC entitled: "IN THE MATTER OF THE APPLICATION FOR THE APPROVAL OF THE AGREEMENT FOR THE SUPPLY OF ELECTRICITY AND CONTRACT FOR ELECTRIC SERVICE ENTERED INTO BY MERALCO WITH NPC SPUG -LUZON AND NPC SPUG -MQNL, RESPECTIVELY, PURSUANT TO ERC RESOLUTION NO.1, SERIES OF 2009, WITH PRAYER FOR PROVISIONAL AUTHORITY, Manila Electric Company (MERALCO), Applicant"

Petition for the Amendment of ERC Resolution No. 16, Series of 2009, entitled "A resolution adopting the rules governing the Automatic Cost Adjustment and True-Up Mechanisms and Corresponding Confirmation Process for Distribution Utilities November 11, 2009

In compliance with the Energy Regulatory Commission's Order dated November 9, 2009 requiring MERALCO to inform its customers of the scheduled hearing in ERC Case No. 2009-013 RM entitled: "IN THE MATTER OF THE PETITION FOR THE AMENDMENT OF ERC RESOLUTION NO. 16, SERIES OF 2009, ENTITLED "A RESOLUTION ADOPTING THE RULES GOVERNING THE AUTOMATIC COST ADJUSTMENT AND TRUE-UP MECHANISMS AND CORRESPONDING CONFIRMATION PROCESS FOR DISTRIBUTION UTILITIES, Manila Electric Company (MERALCO), Petitioner".

Application for Authority to implement the following electric capital projects: (1) Replacement of power transformer bank no. 1 at Sta. Mesa Substation; (2) Replacement of power transformer bank no. 5 at Balintawak Substation; (3) Uprating of power transformer bank no. 1 at Sta. Rosa Substation; (4) Expansion of the First Philippine Industrial Park (FPIP) 115 kv - 34.5 Kv substation; and (5) Construction of Laguna International Industrial Park-Rohm Electronics Philippines, Inc. (LIIP-ROHM) 115 Kv line, with Prayer for Provisional Authority October 30, 2009

In compliance with the Energy Regulatory Commission's Order dated October 26, 2009 requiring MERALCO to inform its customers of the scheduled hearing in ERC Case No. 2009-068 MC entitled: "IN THE MATTER OF THE APPLICATION FOR AUTHORITY TO IMPLEMENT THE FOLLOWING ELECTRIC CAPITAL PROJECTS: (1) REPLACEMENT OF POWER TRANSFORMER BANK NO. 1 AT STA. MESA SUBSTATION; (2) REPLACEMENT OF POWER TRANSFORMER BANK NO. 5 AT BALINTAWAK SUBSTATION; (3) UPRATING OF POWER TRANSFORMER BANK NO. 1 AT STA. ROSA SUBSTATION; (4) EXPANSION OF THE FIRST PHILIPPINE INDUSTRIAL PARK (FPIP) 115 KV - 34.5 KV SUBSTATION; AND (5) CONSTRUCTION OF LAGUNA INTERNATIONAL INDUSTRIAL PARK-ROHM ELECTRONICS PHILIPPINES, INC. (LIIP-ROHM) 115 KV LINE, WITH PRAYER FOR PROVISIONAL AUTHORITY, Manila Electric Company (MERALCO), Applicant".

Application for Approval of: a) Maximum Average Price (MAP) for the Regulatory Year 2010 (RY 2010); and b) Translation of the MAP for RY 2010 Into a Distribution Rate Structure for its Various Customer Classes, with Prayer for Provisional Authority September 1, 2009

In compliance with the Energy Regulatory Commission's Order dated August 24, 2009 requiring MERALCO to inform its customers of the scheduled hearing in ERC Case No. 2009-057 RC entitled: "In the Matter of the Application for Approval of: a) Maximum Average Price (MAP) for the Regulatory Year 2010 (RY 2010); and b) Translation of the MAP for RY 2010 Into a Distribution Rate Structure for its Various Customer Classes, with Prayer for Provisional Authority, Manila Electric Company (MERALCO), Applicant".

Application to Confirm the Transmission Cost Over - and Under - Recoveries and Offset the Net Transmission Cost Over - Recoveries with the Transmission Cost Under - Recoveries Applied for Under ERC Case No. 2007-147 RC, Including Carrying Cost, with Prayer for Provisional Authority September 1, 2009

In compliance with the Energy Regulatory Commission's Order dated August 24, 2009 requiring MERALCO to inform its customers of the scheduled hearing in ERC Case No. 2009-054 RC entitled: "In the Matter of the Application to Confirm the Transmission Cost Over - and Under - Recoveries and Offset the Net Transmission Cost Over - Recoveries with the Transmission Cost Under - Recoveries Applied for Under ERC Case No. 2007-147 RC, Including Carrying Cost, with Prayer for Provisional Authority, Manila Electric Company (MERALCO), Applicant".

Application for Approval of a.)the Memorandum Of Agreement (MOA) by and between CIP2 Power Corporation (CIPP), Carmelray JTCI Corporation (CJC) and Manila Electric Company (MERALCO); b) MOA between CJC and MERALCO; c) MOA between CIPP and MERALCO; d) Deed Of Sale of land between CJC and MERALCO; e) Asset purchase agreement between CIPP and MERALCO; and the construction of a 115 kV-13.8 kV substation within Carmelray Industrial Park II August 26, 2009

In compliance with the Energy Regulatory Commission's Order dated August 11, 2009 requiring MERALCO to inform its customers of the scheduled hearing in ERC Case No. 2009-053 MC entitled: "In the Matter of the Application for Approval of a.)the Memorandum Of Agreement (MOA) by and between CIP2 Power Corporation (CIPP), Carmelray JTCI Corporation (CJC) and Manila Electric Company (MERALCO); b) MOA between CJC and MERALCO; c) MOA between CIPP and MERALCO; d) Deed Of Sale of land between CJC and MERALCO; e) Asset purchase agreement between CIPP and MERALCO; and the construction of a 115 kV-13.8 kV substation within Carmelray Industrial Park II, Manila Electric Company (MERALCO), Applicant".