2013 ERC Postings
IN THE MATTER OF THE APPLICATION FOR APPROVAL OF: A.) MAXIMUM AVERAGE PRICE (MAP) FOR THE REGULATORY YEAR 2014 (RY2014); AND B.) TRANSLATION OF THE MAP FOR RY2014 INTO DISTRIBUTION RATES FOR ITS VARIOUS CUSTOMER CLASSES WITH PRAYER FOR THE ISSUANCE OF A PROVISIONAL AUTHORITY
April 22, 2013
In compliance with the Energy Regulatory Commission's Order dated 08 April 2013 requiring MERALCO to, among other things, inform its consumers within its franchise area, by any other means available and appropriate, of the filing of the instant Amended Application, its reasons therefor, and of the scheduled hearing in ERC Case No. 2013-056 RC entitled: "IN THE MATTER OF THE APPLICATION FOR APPROVAL OF: A.) MAXIMUM AVERAGE PRICE (MAP) FOR THE REGULATORY YEAR 2014 (RY2014); AND B.) TRANSLATION OF THE MAP FOR RY2014 INTO DISTRIBUTION RATES FOR ITS VARIOUS CUSTOMER CLASSES WITH PRAYER FOR THE ISSUANCE OF A PROVISIONAL AUTHORITY,"
IN THE MATTER OF THE APPLICATION FOR APPROVAL OF THE POWER SUPPLY AGREEMENT (PSA) BETWEEN MANILA ELECTRIC COMPANY (MERALCO) AND THERMA MOBILE, INC. (TMO)
April 02, 2013
In compliance with the Energy Regulatory Commission's Order dated 22 March 2013 requiring MERALCO to, among other things, inform its consumers within its franchise area, by any other means available and appropriate, of the filing of the instant Application, its reasons therefor, and of the scheduled hearing in ERC Case No. 2013-043 RC entitled: "IN THE MATTER OF THE APPLICATION FOR APPROVAL OF THE POWER SUPPLY AGREEMENT (PSA) BETWEEN MANILA ELECTRIC COMPANY (MERALCO) AND THERMA MOBILE, INC. (TMO),"
IN THE MATTER OF THE APPLICATION FOR AUTHORITY TO IMPLEMENT A CUSTOMER INFORMATION SYSTEM, WITH PRAYER FOR PROVISIONAL AUTHORITY
March 21, 2013
In compliance with the Energy Regulatory Commission's Order dated 18 March 2013 requiring MERALCO to, among other things, inform its consumers within its franchise area, by any other means available and appropriate, of the filing of the instant Application, its reasons therefor, and of the scheduled hearing in ERC Case No. 2013-032 RC entitled: "IN THE MATTER OF THE APPLICATION FOR AUTHORITY TO IMPLEMENT A CUSTOMER INFORMATION SYSTEM, WITH PRAYER FOR PROVISIONAL AUTHORITY,"
"IN THE MATTER OF THE APPLICATION FOR THE APPROVAL OF THE CONSORTIUM AGREEMENT BETWEEN BATANGAS II ELECTRIC COOPERATIVE, INC. (BATELEC II) AND MANILA ELECTRIC COMPANY (MERALCO) AND THE ISSUANCE OF A FRANCHISE AND A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY (CPCN) TO OWN, OPERATE AND MAINTAIN SUBTRANSMISSION ASSETS IN FAVOR OF THE CONSORTIUM OF BATELEC II AND MERALCO, WITH PRAYER FOR PROVISIONAL AUTHORITY,"
March 08, 2013
In compliance with the Energy Regulatory Commission's Order dated 04 March 2013 requiring MERALCO to, among other things, inform its consumers within its franchise area, by any other means available and appropriate, of the filing of the instant Joint Application, its reasons therefor, and of the scheduled hearing in ERC Case No. 2012-085 MC entitled: "IN THE MATTER OF THE APPLICATION FOR THE APPROVAL OF THE CONSORTIUM AGREEMENT BETWEEN BATANGAS II ELECTRIC COOPERATIVE, INC. (BATELEC II) AND MANILA ELECTRIC COMPANY (MERALCO) AND THE ISSUANCE OF A FRANCHISE AND A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY (CPCN) TO OWN, OPERATE AND MAINTAIN SUBTRANSMISSION ASSETS IN FAVOR OF THE CONSORTIUM OF BATELEC II AND MERALCO, WITH PRAYER FOR PROVISIONAL AUTHORITY,"
IN THE MATTER OF THE APPLICATION FOR AUTHORITY TO IMPLEMENT AN ENTERPRISE ASSET MANAGEMENT (EAM) SYSTEM, WITH PRAYER FOR PROVISIONAL AUTHORITY
February 12, 2013
In compliance with the Energy Regulatory Commission's Order dated 04 February 2013 requiring MERALCO to, among other things, inform its consumers within its franchise area, by any other means available and appropriate, of the filing of the instant Application, its reasons therefor, and of the scheduled hearing in ERC Case No. 2013-014 RC entitled: "IN THE MATTER OF THE APPLICATION FOR AUTHORITY TO IMPLEMENT AN ENTERPRISE ASSET MANAGEMENT (EAM) SYSTEM, WITH PRAYER FOR PROVISIONAL AUTHORITY,"
IN THE MATTER OF THE APPLICATION FOR APPROVAL OF THE POWER SUPPLY AGREEMENT (PSA) BETWEEN MANILA ELECTRIC COMPANY (MERALCO) AND THERMA LUZON, INC. (TLI)
January 11, 2013
In compliance with the Energy Regulatory Commission's Order dated 07 January 2013 requiring MERALCO to, among other things, inform its consumers within its franchise area, by any other means available and appropriate, of the filing of the instant Application, its reasons therefor, and of the scheduled hearing in ERC Case No. 2013-003 RC entitled: "IN THE MATTER OF THE APPLICATION FOR APPROVAL OF THE POWER SUPPLY AGREEMENT (PSA) BETWEEN MANILA ELECTRIC COMPANY (MERALCO) AND THERMA LUZON, INC. (TLI),"
IN THE MATTER OF THE APPLICATION FOR APPROVAL OF THE POWER SUPPLY AGREEMENT (PSA) BETWEEN MANILA ELECTRIC COMPANY (MERALCO) AND AP RENEWABLES, INC. (APRI)
January 11, 2013
In compliance with the Energy Regulatory Commission's Order dated 07 January 2013 requiring MERALCO to, among other things, inform its consumers within its franchise area, by any other means available and appropriate, of the filing of the instant Application, its reasons therefor, and of the scheduled hearing in ERC Case No. 2013-002 RC entitled: "IN THE MATTER OF THE APPLICATION FOR APPROVAL OF THE POWER SUPPLY AGREEMENT (PSA) BETWEEN MANILA ELECTRIC COMPANY (MERALCO) AND AP RENEWABLES, INC. (APRI),"
2012 ERC Postings
IN THE MATTER OF THE APPLICATION FOR APPROVAL OF THE EMERGENCY INSTALLATION OF ONE (1) 83 MVA POWER TRANSFORMER IN THE NEW TERESA SUBSTATION
December 18, 2012
In compliance with the Energy Regulatory Commission's Order dated 10 December 2012 requiring MERALCO to, among other things, inform its consumers within its franchise area, by any other means available and appropriate, of the filing of the instant Application, its reasons therefor, and of the scheduled hearing in ERC Case No. 2012-113 RC entitled: "IN THE MATTER OF THE APPLICATION FOR APPROVAL OF THE EMERGENCY INSTALLATION OF ONE (1) 83 MVA POWER TRANSFORMER IN THE NEW TERESA SUBSTATION"
IN THE MATTER OF THE APPLICATION FOR APPROVAL OF AUTHORITY TO DISPOSE OF AND/OR SELL NON-REGULATORY ASSET BASE (NON-RAB) PROPERTIES, WITH PRAYER FOR PROVISIONAL AUTHORITY
December 18, 2012
In compliance with the Energy Regulatory Commission's Order dated 10 December 2012 requiring MERALCO to, among other things, inform its consumers within its franchise area, by any other means available and appropriate, of the filing of the instant Application, its reasons therefor, and of the scheduled hearing in ERC Case No. 2012-059 MC entitled: "IN THE MATTER OF THE APPLICATION FOR APPROVAL OF AUTHORITY TO DISPOSE OF AND/OR SELL NON-REGULATORY ASSET BASE (NON-RAB) PROPERTIES, WITH PRAYER FOR PROVISIONAL AUTHORITY,"
IN THE MATTER OF THE APPLICATION FOR APPROVAL OF THE REVISED TIME-OF-USE (TOU) RETAIL RATES TO END-USERS, WITH PRAYER FOR PROVISIONAL AUTHORITY
November 26, 2012
In compliance with the Energy Regulatory Commission's Order dated 20 November 2012 requiring MERALCO to, among other things, inform its consumers within its franchise area, by any other means available and appropriate, of the filing of the instant Application, its reasons therefor, and of the scheduled hearing in ERC Case No. 2012-117 RC entitled: "IN THE MATTER OF THE APPLICATION FOR APPROVAL OF THE REVISED TIME-OF-USE (TOU) RETAIL RATES TO END-USERS, WITH PRAYER FOR PROVISIONAL AUTHORITY,"
IN THE MATTER OF THE APPLICATION FOR THE APPROVAL OF THE SALE OF VARIOUS SUB-TRANSMISSION LINES/ASSETS OF THE NATIONAL TRANSMISSION CORPORATION (TRANSCO) TO MANILA ELECTRIC COMPANY (MERALCO) AS COVERED BY A CONTRACT TO SELL, WITH PRAYER FOR PROVISIONAL AUTHORITY
October 2, 2012
In compliance with the Energy Regulatory Commission's Order dated 26 September 2012 requiring MERALCO to, among other things, inform its consumers within its franchise area as well as to employ other practical means for the public dissemination thereof of the scheduled ocular inspection in ERC Case No. 2012-062 RC entitled: "IN THE MATTER OF THE APPLICATION FOR THE APPROVAL OF THE SALE OF VARIOUS SUB-TRANSMISSION LINES/ASSETS OF THE NATIONAL TRANSMISSION CORPORATION (TRANSCO) TO MANILA ELECTRIC COMPANY (MERALCO) AS COVERED BY A CONTRACT TO SELL, WITH PRAYER FOR PROVISIONAL AUTHORITY,"
IN THE MATTER OF THE APPLICATION FOR APPROVAL OF AUTHORITY TO DISPOSE OF AND/OR SELL A PARCEL OF LAND, [1,956.10. SQ. M.] INCLUDING THE IMPROVEMENTS THEREIN, LOCATED AT SAN MARCELINO ST., ERMITA DISTRICT, CITY OF MANILA, WITH PRAYER FOR PROVISIONAL AUTHORITY
August 22, 2012
In compliance with the Energy Regulatory Commission's Order dated 13 August 2012 requiring MERALCO to, among other things, inform its consumers within its franchise area, by any other means available and appropriate, of the filing of the instant Application, its reasons therefor, and of the scheduled hearing in ERC Case No. 2012-043 MC entitled: "IN THE MATTER OF THE APPLICATION FOR APPROVAL OF AUTHORITY TO DISPOSE OF AND/OR SELL A PARCEL OF LAND, [1,956.10. SQ. M.] INCLUDING THE IMPROVEMENTS THEREIN, LOCATED AT SAN MARCELINO ST., ERMITA DISTRICT, CITY OF MANILA, WITH PRAYER FOR PROVISIONAL AUTHORITY,"
IN THE MATTER OF THE APPLICATION TO CONFIRM THE GENERATION RATE OVER/UNDER RECOVERY (GOUR); TRANSMISSION RATE OVER/UNDER RECOVERY (TOUR); SYSTEM LOSS OVER/UNDER RECOVERY (SLOUR); AND LIFELINE SUBSIDY OVER/UNDER RECOVERY (LSOUR) COVERING THE PERIOD JANUARY 2011 TO DECEMBER 2011, AND FOR AUTHORITY TO REFUND/RECOVER CONFIRMED OVER/UNDER RECOVERIES, WITH PRAYER FOR PROVISIONAL AUTHORITY
July 27, 2012
In compliance with the Energy Regulatory Commission's Order dated 16 July 2012 requiring MERALCO to, among other things, inform its consumers within its franchise area, by any other means available and appropriate, of the filing of the instant Application, its reasons therefor, and of the scheduled hearing in ERC Case No. 2012-039 CF entitled: "IN THE MATTER OF THE APPLICATION TO CONFIRM THE GENERATION RATE OVER/UNDER RECOVERY (GOUR); TRANSMISSION RATE OVER/UNDER RECOVERY (TOUR); SYSTEM LOSS OVER/UNDER RECOVERY (SLOUR); AND LIFELINE SUBSIDY OVER/UNDER RECOVERY (LSOUR) COVERING THE PERIOD JANUARY 2011 TO DECEMBER 2011, AND FOR AUTHORITY TO REFUND/RECOVER CONFIRMED OVER/UNDER RECOVERIES, WITH PRAYER FOR PROVISIONAL AUTHORITY,"
IN THE MATTER OF THE APPLICATION FOR APPROVAL OF THE CONTRACT FOR THE SUPPLY OF ELECTRICITY BETWEEN MANILA ELECTRIC COMPANY (MERALCO) AND PANGEA GREEN ENERGY PHILIPPINES, INC. (PANGEA), WITH PRAYER FOR PROVISIONAL AUTHORITY
July 27, 2012
In compliance with the Energy Regulatory Commission's Order dated 16 July 2012 requiring MERALCO to, among other things, inform its consumers within its franchise area, by any other means available and appropriate, of the filing of the instant Application, its reasons therefor, and of the scheduled hearing in ERC Case No. 2012-078 RC entitled: "IN THE MATTER OF THE APPLICATION FOR APPROVAL OF THE CONTRACT FOR THE SUPPLY OF ELECTRICITY BETWEEN MANILA ELECTRIC COMPANY (MERALCO) AND PANGEA GREEN ENERGY PHILIPPINES, INC. (PANGEA), WITH PRAYER FOR PROVISIONAL AUTHORITY,"In compliance with the Energy Regulatory Commission's Order dated 16 July 2012 requiring MERALCO to, among other things, inform its consumers within its franchise area, by any other means available and appropriate, of the filing of the instant Application, its reasons therefor, and of the scheduled hearing in ERC Case No. 2012-078 RC entitled: "IN THE MATTER OF THE APPLICATION FOR APPROVAL OF THE CONTRACT FOR THE SUPPLY OF ELECTRICITY BETWEEN MANILA ELECTRIC COMPANY (MERALCO) AND PANGEA GREEN ENERGY PHILIPPINES, INC. (PANGEA), WITH PRAYER FOR PROVISIONAL AUTHORITY,"
IN THE MATTER OF THE APPLICATION FOR APPROVAL OF THE POWER SUPPLY AGREEMENT (PSA) BETWEEN MANILA ELECTRIC COMPANY (MERALCO) AND SAN MIGUEL ENERGY CORPORATION (SMEC)
July 27, 2012
In compliance with the Energy Regulatory Commission's Order dated 16 July 2012 requiring MERALCO to inform its consumers within its franchise area, by any other means available and appropriate, of the filing of the instant Application, its reasons therefor, and of the scheduled hearing in ERC Case No. 2012-087 RC entitled: "IN THE MATTER OF THE APPLICATION FOR APPROVAL OF THE POWER SUPPLY AGREEMENT (PSA) BETWEEN MANILA ELECTRIC COMPANY (MERALCO) AND SAN MIGUEL ENERGY CORPORATION (SMEC),"
IN THE MATTER OF THE APPLICATION FOR APPROVAL OF THE PURCHASE AND INSTALLATION OF ONE (1) 83 MVA POWER TRANSFORMER FOR THE DILIMAN SUBSTATION AND TO MAINTAIN AND INSTALL AN EMERGENCY SPARE POWER TRANSFORMER
June 25, 2012
In compliance with the Energy Regulatory Commission's Order dated 11 June 2012 requiring MERALCO to inform its consumers within its franchise area, by any other means available and appropriate, of the filing of the instant Application, its reasons therefor, and of the scheduled hearing in ERC Case No. 2012-069 RC entitled: "IN THE MATTER OF THE APPLICATION FOR APPROVAL OF THE PURCHASE AND INSTALLATION OF ONE (1) 83 MVA POWER TRANSFORMER FOR THE DILIMAN SUBSTATION AND TO MAINTAIN AND INSTALL AN EMERGENCY SPARE POWER TRANSFORMER,"
IN THE MATTER OF THE APPLICATION FOR THE APPROVAL OF THE SALE OF VARIOUS SUBTRANSMISSION LINES/ASSETS OF THE NATIONAL TRANSMISSION CORPORATION (TRANSCO) TO MANILA ELECTRIC COMPANY (MERALCO), AS COVERED BY A CONTRACT TO SELL, WITH PRAYER FOR PROVISIONAL AUTHORITY
June 13, 2012
In compliance with the Energy Regulatory Commission's Order dated 04 June 2012 requiring MERALCO and TRANSCO to inform the consumers within the franchise area of MERALCO, by any other means available and appropriate, of the filing of the instant Joint Application, its reasons therefor, and of the scheduled hearing in ERC Case No. 2012-062 RC entitled: "IN THE MATTER OF THE APPLICATION FOR THE APPROVAL OF THE SALE OF VARIOUS SUBTRANSMISSION LINES/ASSETS OF THE NATIONAL TRANSMISSION CORPORATION (TRANSCO) TO MANILA ELECTRIC COMPANY (MERALCO), AS COVERED BY A CONTRACT TO SELL, WITH PRAYER FOR PROVISIONAL AUTHORITY,"
IN THE MATTER OF THE APPLICATION FOR APPROVAL OF AUTHORITY TO LEASE REGULATORY ASSET BASE (RAB) PROPERTIES CLASSIFIED AS: (A) POLE ATTACHMENT; AND (B) LEASE OF LOTS/ SPACE/ OTHER EQUIPMENT, TOGETHER WITH THE ATTACHED PRO-FORMA AGREEMENTS, WITH PRAYER FOR PROVISIONAL AUTHORITY
June 06, 2012
In compliance with the Energy Regulatory Commission's Order dated 01 June 2012 requiring MERALCO to inform its consumers within its franchise area, by any other means available and appropriate, of the filing of the instant Application, its reasons therefor, and of the scheduled hearing in ERC Case No. 2012-013 MC entitled: "IN THE MATTER OF THE APPLICATION FOR APPROVAL OF AUTHORITY TO LEASE REGULATORY ASSET BASE (RAB) PROPERTIES CLASSIFIED AS: (A) POLE ATTACHMENT; AND (B) LEASE OF LOTS/ SPACE/ OTHER EQUIPMENT, TOGETHER WITH THE ATTACHED PRO-FORMA AGREEMENTS, WITH PRAYER FOR PROVISIONAL AUTHORITY,"
IN THE MATTER OF THE APPLICATION FOR APPROVAL OF THE POWER SUPPLY AGREEMENT (PSA) BETWEEN MANILA ELECTRIC COMPANY (MERALCO) AND MASINLOC POWER PARTNERS CO., LTD. (MPPCL)
May 18, 2012
In compliance with the Energy Regulatory Commission's Order dated 11 May 2012 requiring MERALCO to inform its consumers within its franchise area, by any other means available and appropriate, of the filing of the instant Application, its reasons therefor, and of the scheduled hearing in ERC Case No. 2012-036 RC entitled, "IN THE MATTER OF THE APPLICATION FOR APPROVAL OF THE POWER SUPPLY AGREEMENT (PSA) BETWEEN MANILA ELECTRIC COMPANY (MERALCO) AND MASINLOC POWER PARTNERS CO., LTD. (MPPCL),"
IN THE MATTER OF THE APPLICATION FOR APPROVAL OF THE POWER SUPPLY AGREEMENT (PSA) BETWEEN MANILA ELECTRIC COMPANY (MERALCO) AND SOUTH PREMIERE POWER CORP. (SPPC)
May 18, 2012
In compliance with the Energy Regulatory Commission's Order dated 11 May 2012 requiring MERALCO to inform its consumers within its franchise area, by any other means available and appropriate, of the filing of the instant Application, its reasons therefor, and of the scheduled hearing in ERC Case No. 2012-034 RC entitled, "IN THE MATTER OF THE APPLICATION FOR APPROVAL OF THE POWER SUPPLY AGREEMENT (PSA) BETWEEN MANILA ELECTRIC COMPANY (MERALCO) AND SOUTH PREMIERE POWER CORP. (SPPC),"
IN THE MATTER OF THE APPLICATION FOR APPROVAL OF: A.) MAXIMUM AVERAGE PRICE (MAP) FOR THE REGULATORY YEAR 2013; AND B.) TRANSLATION OF THE MAXIMUM AVERAGE PRICE FOR REGULATORY YEAR 2013 (RY2013) INTO DISTRIBUTION RATES FOR ITS VARIOUS CUSTOMER CLASSES, WITH PRAYER FOR THE ISSUANCE OF A PROVISIONAL AUTHORITY
April 30, 2012
In compliance with the Energy Regulatory Commission's Order dated 23 April 2012 requiring MERALCO to inform its consumers within its franchise area, by any other means available and appropriate, of the filing of the instant Application, its reasons therefor, and of the scheduled hearing in ERC Case No. 2012-054 RC entitled, "IN THE MATTER OF THE APPLICATION FOR APPROVAL OF: A.) MAXIMUM AVERAGE PRICE (MAP) FOR THE REGULATORY YEAR 2013; AND B.) TRANSLATION OF THE MAXIMUM AVERAGE PRICE FOR REGULATORY YEAR 2013 (RY2013) INTO DISTRIBUTION RATES FOR ITS VARIOUS CUSTOMER CLASSES, WITH PRAYER FOR THE ISSUANCE OF A PROVISIONAL AUTHORITY,"
IN THE MATTER OF THE APPLICATION FOR APPROVAL OF THE POWER SUPPLY AGREEMENT (PSA) BETWEEN MANILA ELECTRIC COMPANY (MERALCO) AND THERMA LUZON, INC. (TLI)
April 30, 2012
In compliance with the Energy Regulatory Commission's Order dated 23 April 2012 requiring MERALCO to inform its consumers within its franchise area, by any other means available and appropriate, of the filing of the instant Application, its reasons therefor, and of the scheduled hearing in ERC Case No. 2012-035 RC entitled, "IN THE MATTER OF THE APPLICATION FOR APPROVAL OF THE POWER SUPPLY AGREEMENT (PSA) BETWEEN MANILA ELECTRIC COMPANY (MERALCO) AND THERMA LUZON, INC. (TLI),"
IN THE MATTER OF THE APPLICATION FOR APPROVAL OF THE POWER SUPPLY AGREEMENT (PSA) BETWEEN MANILA ELECTRIC COMPANY (MERALCO) AND SEM-CALACA POWER CORPORATION (SCPC), WITH PRAYER FOR PROVISIONAL AUTHORITY
April 20, 2012
In compliance with the Energy Regulatory Commission's Order dated 12 April 2012 requiring MERALCO to inform its customers within its franchise area, by any other means available and appropriate, of the filing of the instant Application, its reasons therefor, and of the scheduled hearing in ERC Case No. 2012-037 RC entitled, "IN THE MATTER OF THE APPLICATION FOR APPROVAL OF THE POWER SUPPLY AGREEMENT (PSA) BETWEEN MANILA ELECTRIC COMPANY (MERALCO) AND SEM-CALACA POWER CORPORATION (SCPC), WITH PRAYER FOR PROVISIONAL AUTHORITY,"
IN THE MATTER OF THE APPLICATION FOR AUTHORITY TO SUBSTITUTE VARIOUS APPROVED THIRD REGULATORY PERIOD CAPITAL EXPENDITURE PROJECTS WITH THE IMPLEMENTATION SERVICES OF PREPAID ELECTRICITY MANAGEMENT SYSTEM (IS-PEMS) PROJECT, WITH URGENT PRAYER FOR PROVISIONAL AUTHORITY, Manila Electric Company (MERALCO), Applicant
March 27, 2012
In compliance with the Energy Regulatory Commission's Order dated 22 March 2012 requiring MERALCO to inform its customers within its franchise area, by any other means available and appropriate, of the filing of the instant Application, its reasons therefor, and of the scheduled hearing in ERC Case No. 2012-033 RC entitled, "IN THE MATTER OF THE APPLICATION FOR AUTHORITY TO SUBSTITUTE VARIOUS APPROVED THIRD REGULATORY PERIOD CAPITAL EXPENDITURE PROJECTS WITH THE IMPLEMENTATION SERVICES OF PREPAID ELECTRICITY MANAGEMENT SYSTEM (IS-PEMS) PROJECT, WITH URGENT PRAYER FOR PROVISIONAL AUTHORITY, Manila Electric Company (MERALCO), Applicant,"
IN THE MATTER OF THE APPLICATION FOR AUTHORITY TO IMPLEMENT AND COLLECT THE LOCAL FRANCHISE TAX (LFT) RATE IN THE CITY OF BIÑAN, LAGUNA, WITH PRAYER FOR PROVISIONAL AUTHORITY, Manila Electric Company (MERALCO), Applicant
February 2, 2012
In compliance with the Energy Regulatory Commission's Order dated 24 January 2012 requiring MERALCO to inform its customers within its franchise area, by any other means available and appropriate, of the filing of the instant Application, its reasons therefor, and of the scheduled hearing in ERC Case No. 2011-067 CF entitled, "IN THE MATTER OF THE APPLICATION FOR AUTHORITY TO IMPLEMENT AND COLLECT THE LOCAL FRANCHISE TAX (LFT) RATE IN THE CITY OF BIÑAN, LAGUNA, WITH PRAYER FOR PROVISIONAL AUTHORITY, Manila Electric Company (MERALCO), Applicant,"
IN THE MATTER OF THE APPLICATION FOR AUTHORITY TO COLLECT LOCAL FRANCHISE TAX (LFT) RATE IN THE CITY OF ANTIPOLO, WITH PRAYER FOR PROVISIONAL AUTHORITY, Manila Electric Company (MERALCO), Applicant
February 2, 2012
In compliance with the Energy Regulatory Commission's Order dated 24 January 2012 requiring MERALCO to inform its customers within its franchise area, by any other means available and appropriate, of the filing of the instant Application, its reasons therefor, and of the scheduled hearing in ERC Case No. 2011-066 CF entitled, "IN THE MATTER OF THE APPLICATION FOR AUTHORITY TO COLLECT LOCAL FRANCHISE TAX (LFT) RATE IN THE CITY OF ANTIPOLO, WITH PRAYER FOR PROVISIONAL AUTHORITY, Manila Electric Company (MERALCO), Applicant,"
IN THE MATTER OF THE APPLICATION FOR AUTHORITY TO COLLECT LOCAL FRANCHISE TAX (LFT) RATE IN THE CITY OF DASMARIÑAS, WITH PRAYER FOR PROVISIONAL AUTHORITY, Manila Electric Company (MERALCO), Applicant
February 2, 2012
In compliance with the Energy Regulatory Commission's Order dated 24 January 2012 requiring MERALCO to inform its customers within its franchise area, by any other means available and appropriate, of the filing of the instant Application, its reasons therefor, and of the scheduled hearing in ERC Case No. 2011-068 CF entitled, "IN THE MATTER OF THE APPLICATION FOR AUTHORITY TO COLLECT LOCAL FRANCHISE TAX (LFT) RATE IN THE CITY OF DASMARIÑAS, WITH PRAYER FOR PROVISIONAL AUTHORITY, Manila Electric Company (MERALCO), Applicant,"
IN THE MATTER OF THE APPLICATION TO CONFIRM THE GENERATION RATE OVER/UNDER RECOVERY (GOUR); TRANSMISSION RATE OVER/UNDER RECOVERY (TOUR); SYSTEM LOSS OVER/UNDER RECOVERY (SLOUR); AND LIFELINE SUBSIDY OVER/UNDER RECOVERY (LSOUR); AND FOR AUTHORITY TO REFUND/RECOVER CONFIRMED OVER/UNDER RECOVERIES, WITH PRAYER FOR PROVISIONAL AUTHORITY
January 6, 2012
In compliance with the Energy Regulatory Commission's Order dated 02 January 2012 requiring MERALCO to inform its customers within its franchise area, by any other means available and appropriate, of the filing of the instant Supplemental Application, its reasons therefor, and of the scheduled hearing in ERC Case No. 2011-010 CF entitled, "IN THE MATTER OF THE APPLICATION TO CONFIRM THE GENERATION RATE OVER/UNDER RECOVERY (GOUR); TRANSMISSION RATE OVER/UNDER RECOVERY (TOUR); SYSTEM LOSS OVER/UNDER RECOVERY (SLOUR); AND LIFELINE SUBSIDY OVER/UNDER RECOVERY (LSOUR); AND FOR AUTHORITY TO REFUND/RECOVER CONFIRMED OVER/UNDER RECOVERIES, WITH PRAYER FOR PROVISIONAL AUTHORITY, Manila Electric Company (MERALCO), Applicant,"
2011 ERC Postings
IN THE MATTER OF THE APPLICATION FOR THE APPROVAL AND RECOVERY OF GENERATION COST UNDER THE SECOND GENERATION RATE ADJUSTMENT MECHANISM (2ND GRAM), TOGETHER WITH CARRYING CHARGES, WITH PRAYER FOR PROVISIONAL AUTHORITY
August 22, 2011
In compliance with the Energy Regulatory Commission's Order dated July 25, 2011 requiring MERALCO to inform its customers within its franchise area, by any other means available and appropriate, of the filing of the instant application, its reasons therefor, and of the scheduled hearing in ERC Case No. 2010-135 RC entitled, "IN THE MATTER OF THE APPLICATION FOR THE APPROVAL AND RECOVERY OF GENERATION COST UNDER THE SECOND GENERATION RATE ADJUSTMENT MECHANISM (2ND GRAM), TOGETHER WITH CARRYING CHARGES, WITH PRAYER FOR PROVISIONAL AUTHORITY,"
IN THE MATTER OF THE APPLICATION FOR APPROVAL OF: A.) MAXIMUM AVERAGE PRICE (MAP) FOR THE REGULATORY YEAR 2012; AND B.) TRANSLATION OF THE MAXIMUM AVERAGE PRICE FOR THE REGULATORY YEAR 2012 (RY2012) INTO A DISTRIBUTION RATE STRUCTURE FOR MERALCO'S VARIOUS CUSTOMER CLASSES, WITH PRAYER FOR THE ISSUANCE OF A PROVISIONAL AUTHORITY
August 18, 2011
In compliance with the Energy Regulatory Commission's Order dated August 8, 2011 requiring MERALCO to inform its customers within its franchise area, by any other means available and appropriate, of the filing of the instant application, its reasons therefor, and the scheduled hearing in ERC Case No. 2011-088 RC entitled, "IN THE MATTER OF THE APPLICATION FOR APPROVAL OF: A.) MAXIMUM AVERAGE PRICE (MAP) FOR THE REGULATORY YEAR 2012; AND B.) TRANSLATION OF THE MAXIMUM AVERAGE PRICE FOR THE REGULATORY YEAR 2012 (RY2012) INTO A DISTRIBUTION RATE STRUCTURE FOR MERALCO'S VARIOUS CUSTOMER CLASSES, WITH PRAYER FOR THE ISSUANCE OF A PROVISIONAL AUTHORITY,"
IN THE MATTER OF THE APPLICATION FOR THE APPROVAL OF THE CONNECTION AGREEMENT AND DISTRIBUTION WHEELING SERVICE AGREEMENT, TOGETHER WITH THE ATTACHED RATE SCHEDULES, BETWEEN MERALCO AND EAGLE CEMENT CORPORATION, PURSUANT TO ERC RESOLUTION NO. 1, SERIES OF 2009, WITH PRAYER FOR PROVISIONAL AUTHORITY
August 11, 2011
In compliance with the Energy Regulatory Commission's Order dated July 27, 2011 requiring MERALCO to inform its customers within its franchise area, by any other means available and appropriate, of the filing of the instant application, its reasons therefor, and of the scheduled hearing in ERC Case No. 2010-089 RC entitled, "IN THE MATTER OF THE APPLICATION FOR THE APPROVAL OF THE CONNECTION AGREEMENT AND DISTRIBUTION WHEELING SERVICE AGREEMENT, TOGETHER WITH THE ATTACHED RATE SCHEDULES, BETWEEN MERALCO AND EAGLE CEMENT CORPORATION, PURSUANT TO ERC RESOLUTION NO. 1, SERIES OF 2009, WITH PRAYER FOR PROVISIONAL AUTHORITY,"
IN THE MATTER OF THE APPLICATION FOR THE APPROVAL OF THE CONNECTION AGREEMENT (CA) AND DISTRIBUTION WHEELING SERVICE AGREEMENT (DWSA), TOGETHER WITH THE ATTACHED RATE SCHEDULE, BETWEEN MANILA ELECTRIC COMPANY (MERALCO) AND SOLID DEVELOPMENT CORPORATION (AS DULY REPRESENTED BY TEAM PHILIPPINES ENERGY CORPORATION) AND MERALCO AND TEAM PHILIPPINES ENERGY CORPORATION, RESPECTIVELY, WITH PRAYER FOR PROVISIONAL AUTHORITY
August 1, 2011
In compliance with the Energy Regulatory Commission's Order dated July 22, 2011 requiring MERALCO to inform its customers within its franchise area, by any other means available and appropriate, of the filing of the instant application, its reasons therefor, and of the scheduled hearing in ERC Case No. 2011-070 RC entitled, "IN THE MATTER OF THE APPLICATION FOR THE APPROVAL OF THE CONNECTION AGREEMENT (CA) AND DISTRIBUTION WHEELING SERVICE AGREEMENT (DWSA), TOGETHER WITH THE ATTACHED RATE SCHEDULE, BETWEEN MANILA ELECTRIC COMPANY (MERALCO) AND SOLID DEVELOPMENT CORPORATION (AS DULY REPRESENTED BY TEAM PHILIPPINES ENERGY CORPORATION) AND MERALCO AND TEAM PHILIPPINES ENERGY CORPORATION, RESPECTIVELY, WITH PRAYER FOR PROVISIONAL AUTHORITY,"
IN THE MATTER OF THE APPLICATION FOR APPROVAL OF THE POWER SUPPLY AGREEMENT (PSA) BETWEEN SOUTH PREMIERE POWER CORPORATION (SPPC) AND MANILA ELECTRIC COMPANY (MERALCO), WITH PRAYER FOR PROVISIONAL AUTHORITY
August 1, 2011
In compliance with the Energy Regulatory Commission's Order dated July 22, 2011 requiring MERALCO to inform its customers within its franchise area, by any other means available and appropriate, of the filing of the instant application, its reasons therefor, and of the scheduled hearing in ERC Case No. 2011-098 RC entitled, "IN THE MATTER OF THE APPLICATION FOR APPROVAL OF THE POWER SUPPLY AGREEMENT (PSA) BETWEEN SOUTH PREMIERE POWER CORPORATION (SPPC) AND MANILA ELECTRIC COMPANY (MERALCO), WITH PRAYER FOR PROVISIONAL AUTHORITY,"
IN THE MATTER OF THE APPLICATION FOR APPROVAL OF THE RATE SCHEDULES AND APPRAISAL OF PROPERTIES, WITH PRAYER FOR PROVISIONAL AUTHORITY, MANILA ELECTRIC COMPANY (MERALCO), Applicant
July 28, 2011
Pursuant to the Energy Regulatory Commission's Order extending the implementation of the SC Refund up to December 31, 2015 in ERC Case No. 2001-243 (ERB Case No. 93-118) entitled, "IN THE MATTER OF THE APPLICATION FOR APPROVAL OF THE RATE SCHEDULES AND APPRAISAL OF PROPERTIES, WITH PRAYER FOR PROVISIONAL AUTHORITY, MANILA ELECTRIC COMPANY (MERALCO), Applicant,"
IN THE MATTER OF THE APPLICATION TO CONFIRM THE GENERATION RATE OVER/UNDER RECOVERY (GOUR); TRANSMISSION RATE OVER/UNDER RECOVERY (TOUR); SYSTEM LOSS OVER/UNDER RECOVERY (SLOUR); AND LIFELINE SUBSIDY OVER/UNDER RECOVERY (LSOUR); AND FOR AUTHORITY TO REFUND/RECOVER CONFIRMED OVER/UNDER RECOVERIES, WITH PRAYER FOR PROVISIONAL AUTHORITY, Manila Electric Company (MERALCO), Applicant.
July 26, 2011
In compliance with the Energy Regulatory Commission's Order dated July 11, 2011 requiring MERALCO to inform its customers within its franchise area, by any other means available and appropriate, of the filing of the instant application, its reasons therefor, and of the scheduled hearing in ERC Case No. 2011-010 CF entitled, "IN THE MATTER OF THE APPLICATION TO CONFIRM THE GENERATION RATE OVER/UNDER RECOVERY (GOUR); TRANSMISSION RATE OVER/UNDER RECOVERY (TOUR); SYSTEM LOSS OVER/UNDER RECOVERY (SLOUR); AND LIFELINE SUBSIDY OVER/UNDER RECOVERY (LSOUR); AND FOR AUTHORITY TO REFUND/RECOVER CONFIRMED OVER/UNDER RECOVERIES, WITH PRAYER FOR PROVISIONAL AUTHORITY, Manila Electric Company (MERALCO), Applicant".
IN THE MATTER OF THE APPLICATION FOR AUTHORITY TO IMPLEMENT AND COLLECT THE LOCAL FRANCHISE TAX RATE IN THE CITY OF LUCENA,
QUEZON, WITH PRAYER FOR PROVISIONAL AUTHORITY, Manila Electric Company (MERALCO), Applicant
June 2, 2011
In compliance with the Energy Regulatory Commission's Order dated May 23, 2011 requiring MERALCO to inform its customers of the
scheduled hearing in ERC Case No. 2011-044 RC entitled, "IN THE MATTER OF THE APPLICATION FOR AUTHORITY TO IMPLEMENT AND COLLECT THE
LOCAL FRANCHISE TAX RATE IN THE CITY OF LUCENA, QUEZON, WITH PRAYER FOR PROVISIONAL AUTHORITY, Manila Electric Company (MERALCO), Applicant,"
IN THE MATTER OF THE APPLICATION FOR AUTHORITY TO RECOVER THE LOCAL FRANCHISE TAX (LFT) PAID TO BULACAN PROVINCE, BATANGAS PROVINCE,
CAVITE PROVINCE, LAGUNA PROVINCE, RIZAL PROVINCE, SAN JOSE DEL MONTE CITY, BATANGAS CITY, SAN PABLO CITY, TAGAYTAY CITY, LUCENA CITY,
MANDALUYONG CITY, MARIKINA CITY, QUEZON CITY, CALOOCAN CITY, PASAY CITY, LAS PIÑAS CITY, CITY OF MANILA, PASIG CITY, AND CALAMBA CITY,
WITH PRAYER FOR PROVISIONAL AUTHORITY, Manila Electric Company (MERALCO), Applicant
June 2, 2011
In compliance with the Energy Regulatory Commission's Order dated May 23, 2011 requiring MERALCO to inform its customers of the
scheduled hearing in ERC Case No. 2011-045 RC entitled, "IN THE MATTER OF THE APPLICATION FOR AUTHORITY TO RECOVER THE LOCAL FRANCHISE TAX
(LFT) PAID TO BULACAN PROVINCE, BATANGAS PROVINCE, CAVITE PROVINCE, LAGUNA PROVINCE, RIZAL PROVINCE, SAN JOSE DEL MONTE CITY, BATANGAS CITY,
SAN PABLO CITY, TAGAYTAY CITY, LUCENA CITY, MANDALUYONG CITY, MARIKINA CITY, QUEZON CITY, CALOOCAN CITY, PASAY CITY, LAS PIÑAS CITY, CITY OF
MANILA, PASIG CITY, AND CALAMBA CITY, WITH PRAYER FOR PROVISIONAL AUTHORITY, Manila Electric Company (MERALCO), Applicant,"
In the Matter of the Petition for the Amendment of the Guidelines to the Sale and Transfer of TRANSCO’s Subtransmission Assets and
the Franchising of Qualified Consortiums, Private Electric Power Operators Association, Inc. (PEPOA) and Manila Electric Company (MERALCO),
Petitioners
May 5, 2011
In compliance with the Energy Regulatory Commission's Order dated April 25, 2011 requiring MERALCO to inform its customers of the scheduled
hearing in ERC CASE NO. 2010-012 RM entitled: "In the Matter of the Petition for the Amendment of the Guidelines to the Sale and Transfer of
TRANSCO's Subtransmission Assets and the Franchising of Qualified Consortiums, Private Electric Power Operators Association, Inc. (PEPOA) and
Manila Electric Company (MERALCO), Petitioners"
IN THE MATTER OF THE APPLICATION FOR AUTHORITY TO ISSUE BONDS OR EVIDENCE OF INDEBTEDNESS NOT TO EXCEED THE 50% LONG-TERM DEBT TO
EQUITY RATIO, WITH PRAYER FOR PROVISIONAL AUTHORITY, Manila Electric Company (MERALCO), Applicant
March 4, 2011
In compliance with the Energy Regulatory Commission's Order dated February 28, 2011 requiring MERALCO to inform its customers of the
scheduled hearing in ERC Case No. 2011-007 MC entitled, "IN THE MATTER OF THE APPLICATION FOR AUTHORITY TO ISSUE BONDS OR EVIDENCE OF
INDEBTEDNESS NOT TO EXCEED THE 50% LONG-TERM DEBT TO EQUITY RATIO, WITH PRAYER FOR PROVISIONAL AUTHORITY, Manila Electric Company (MERALCO),
Applicant,"
IN THE MATTER OF THE APPLICATION FOR APPROVAL OF THE CONTRACT FOR THE SUPPLY OF ELECTRICITY BETWEEN BACAVALLEY ENERGY INC. (BEI),
AND MANILA ELECTRIC COMPANY (MERALCO), WITH PRAYER FOR PROVISIONAL AUTHORITY, Manila Electric Company (MERALCO), Applicant
February 9, 2011
In compliance with the Energy Regulatory Commission's Order dated February 7, 2011 requiring MERALCO to inform its customers of the
scheduled hearing in ERC Case No. 2010-150 RC entitled, "IN THE MATTER OF THE APPLICATION FOR APPROVAL OF THE CONTRACT FOR THE SUPPLY OF
ELECTRICITY BETWEEN BACAVALLEY ENERGY INC. (BEI), AND MANILA ELECTRIC COMPANY (MERALCO), WITH PRAYER FOR PROVISIONAL AUTHORITY, Manila
Electric Company (MERALCO), Applicant,"
Application for Authority To Retire (1) The Cavite Substation located at Cavite City,
(2) The Lucena II Substation located at Lucena City, Quezon Province, (3) Pagbilao Substation located at
Pagbilao, Quezon Province, (4) Forbes Park Substation located at Makati City, And (5) Tondo Substation
located at Tondo, Manila and to withdraw from service certain equipment and machinery installed in the
Substations, with Prayer for Provincial Authority
January 19, 2011
In compliance with the Energy Regulatory Commission's Order dated January 10, 2011 requiring MERALCO to
inform its customers of the scheduled hearing in ERC Case No. 2010-146 RC entitled, "IN THE MATTER OF THE
APPLICATION FOR AUTHORITY TO RETIRE (1) THE CAVITE SUBSTATION LOCATED AT CAVITE CITY, (2) THE LUCENA II
SUBSTATION LOCATED AT LUCENA CITY, QUEZON PROVINCE, (3) PAGBILAO SUBSTATION LOCATED AT PAGBILAO, QUEZON
PROVINCE, (4) FORBES PARK SUBSTATION LOCATED AT MAKATI CITY, AND (5) TONDO SUBSTATION LOCATED AT TONDO,
MANILA AND TO WITHDRAW FROM SERVICE CERTAIN EQUIPMENT AND MACHINERY INSTALLED IN THE SUBSTATIONS, WITH
PRAYER FOR PROVISIONAL AUTHORITY, Manila Electric Company (MERALCO), Applicant,"
Application for Approval of the Annual Revenue Requirement and Performance Incentive Scheme
for the Third Regulatory Period (2011 to 2015) in accordance with the Provisions of the Rules
for Setting Distribution Wheeling Rates (RDWR)
January 13, 2011
In compliance with the Energy Regulatory Commission's Notice dated December 15, 2010 requiring MERALCO to inform
its customers of the scheduled public consultation on the Draft Determination in ERC Case No. 2010-069 RC entitled,
"In the Matter of the Application for Approval of the Annual Revenue Requirement and Performance Incentive Scheme for
the Third Regulatory Period (2011 to 2015) in accordance with the Provisions of the Rules for Setting Distribution
Wheeling Rates (RDWR), as Amended, Manila Electric Company (MERALCO), Applicant,"
2010 ERC Positngs
Application for approval of the annual revenue requirement and performance incentive scheme for the third regulatory period (2011 to 2015) in accordance with the provisions of the rules for setting distribution wheeling rates (RDWR). September 3, 2010
In compliance with the Energy Regulatory Commission's Order dated August 31, 2010 requiring MERALCO to inform its customers of the scheduled hearing in ERC Case No. 2010-069 RC entitled "IN THE MATTER OF THE APPLICATION FOR APPROVAL OF THE ANNUAL REVENUE REQUIREMENT AND PERFORMANCE INCENTIVE SCHEME FOR THE THIRD REGULATORY PERIOD (2011 TO 2015) IN ACCORDANCE WITH THE PROVISIONS OF THE RULES FOR SETTING DISTRIBUTION WHEELING RATES (RDWR), Manila Electric Company (MERALCO), Applicant,"
Application for Approval of the Agreement for the Supply of Electricity between the Manila Electric Company (MERALCO) and the Municipality of Norzagaray, Bulacan, Pursuant to ERC Resolution no. 1, Series of 2009, with Prayer for the Issuance of a Provisional Authority July 12, 2010
In compliance with the Energy Regulatory Commission's Order dated June 28, 2010 requiring MERALCO to inform its customers of the scheduled hearing in ERC Case No. 2010-035 RC entitled "IN THE MATTER OF THE APPLICATION FOR APPROVAL OF THE AGREEMENT FOR THE SUPPLY OF ELECTRICITY BETWEEN THE MANILA ELECTRIC COMPANY (MERALCO) AND THE MUNICIPALITY OF NORZAGARAY, BULACAN, PURSUANT TO ERC RESOLUTION NO. 1, SERIES OF 2009, WITH PRAYER FOR THE ISSUANCE OF A PROVISIONAL AUTHORITY, Manila Electric Company (MERALCO), Applicant,"
Application for Approval of the Annual Revenue Requirement and Performance Incentive Scheme for the Third Regulatory Period (2011 to 2015) in accordance with the Provisions of the Rules for Setting Distribution Wheeling Rates (RDWR) June 29, 2010
In compliance with the Energy Regulatory Commission's Order dated June 23, 2010 requiring MERALCO to inform its customers of the scheduled hearing in ERC Case No. 2010-069 RC entitled "In the Matter of the Application for Approval of the Annual Revenue Requirement and Performance Incentive Scheme for the Third Regulatory Period (2011 to 2015) in accordance with the Provisions of the Rules for Setting Distribution Wheeling Rates (RDWR), as Amended, Manila Electric Company (MERALCO), Applicant."
Application for Approval of: A.) Maximum Average Price (Map) for the Regulatory Year 2011; and B.) Translation of the Maximum Average Price for Regulatory Year 2011 (Ry2011) into a Distribution Rate Structure for its Various Customer Classes, With Prayer for the Issuance of a Provisional Authority May 12, 2010
In compliance with the Energy Regulatory Commission's Order dated May 5, 2010 requiring MERALCO to inform its customers of the scheduled hearing in ERC Case No. 2010-027 RC entitled "IN THE MATTER OF THE APPLICATION FOR APPROVAL OF: A.) MAXIMUM AVERAGE PRICE (MAP) FOR THE REGULATORY YEAR 2011; AND B.) TRANSLATION OF THE MAXIMUM AVERAGE PRICE FOR REGULATORY YEAR 2011 (RY2011) INTO A DISTRIBUTION RATE STRUCTURE FOR ITS VARIOUS CUSTOMER CLASSES, WITH PRAYER FOR THE ISSUANCE OF A PROVISIONAL AUTHORITY, Manila Electric Company (MERALCO), Applicant,"
Application for the Approval of the Agreement for the Supply of Electric Energy entered into by MERALCO with the National Irrigation Administration pursuant to ERC Resolution No. 1, Series of 2009, with Prayer for Provisional Authority March 31, 2010
In compliance with the Energy Regulatory Commission's Order dated March 24, 2010 requiring MERALCO to inform its customers of the scheduled hearing in ERC Case No. 2010-013 RC entitled "In the Matter of the Application for the Approval of the Agreement for the Supply of Electric Energy entered into by MERALCO with the National Irrigation Administration pursuant to ERC Resolution No. 1, Series of 2009, with Prayer for Provisional Authority, Manila Electric Company (MERALCO), Applicant".
Application for Authority to Retire the Morong Substation Located at Morong, Province of Rizal, the Gaya-Gaya Substation Located at San Jose Del Monte, Province of Bulacan and the Mauban Substation Located at Mauban, Province of Quezon, and to Withdraw from the Service Certain Equipment and Machinery Installed in the said Substations, with Prayer for Provisional Authority March 30, 2010
In compliance with the Energy Regulatory Commission's Order dated March 22, 2010 requiring MERALCO to inform its customers of the scheduled ocular inspection in ERC CASE NO. 2009-118 MC entitled: "APPLICATION FOR AUTHORITY TO RETIRE THE MORONG SUBSTATION LOCATED AT MORONG, PROVINCE OF RIZAL, THE GAYA-GAYA SUBSTATION LOCATED AT SAN JOSE DEL MONTE, PROVINCE OF BULACAN AND THE MAUBAN SUBSTATION LOCATED AT MAUBAN, PROVINCE OF QUEZON, AND TO WITHDRAW FROM THE SERVICE CERTAIN EQUIPMENT AND MACHINERY INSTALLED IN THE SAID SUBSTATIONS, WITH PRAYER FOR PROVISIONAL AUTHORITY, Manila Electric Company (MERALCO), Applicant".
Application for the Approval of the Sale of Various Subtransmission Lines/Assets of the National Transmission Corporation (TRANSCO) to Manila Electric Company (MERALCO), as Covered by a Contract to Sell, with Prayer for Provisional Authority March 30, 2010
In compliance with the Energy Regulatory Commission's Order dated March 22, 2010 requiring MERALCO to inform its customers of the scheduled ocular inspection in ERC CASE NO. 2009-174 RC entitled: "APPLICATION FOR THE APPROVAL OF THE SALE OF VARIOUS SUBTRANSMISSION LINES/ASSETS OF THE NATIONAL TRANSMISSION CORPORATION (TRANSCO) TO MANILA ELECTRIC COMPANY (MERALCO), AS COVERED BY A CONTRACT TO SELL, WITH PRAYER FOR PROVISIONAL AUTHORITY, Manila Electric Company (MERALCO), Applicant"
Petition for approval of a lower generation charge for billing month of March 2010 and for the recovery of the differential generation charge within a six (6)-month period, including the carrying cost, with prayer for Provisional Authority March 18, 2010
In compliance with the Energy Regulatory Commission's Order dated March 10, 2010 requiring MERALCO to inform its customers of the scheduled hearing in ERC CASE NO. 2010-017 RC entitled: "PETITION FOR APPROVAL OF A LOWER GENERATION CHARGE FOR BILLING MONTH OF MARCH 2010 AND FOR THE RECOVERY OF THE DIFFERENTIAL GENERATION CHARGE WITHIN A SIX (6)-MONTH PERIOD, INCLUDING THE CARRYING COST, WITH PRAYER FOR PROVISIONAL AUTHORITY, Manila Electric Company (MERALCO), Applicant"
Application for the Approval of the Sale of Various Subtransmission Lines/Assets of the National Transmission Corporation (TRANSCO) to Manila Electric Company (MERALCO), as Covered by a Contract to Sell, with Prayer for Provisional Authority February 26, 2010
In compliance with the Energy Regulatory Commission's Order dated February 15, 2010 requiring MERALCO to inform its customers of the scheduled hearing in ERC CASE NO. 2009-174 RC entitled: "APPLICATION FOR THE APPROVAL OF THE SALE OF VARIOUS SUBTRANSMISSION LINES/ASSETS OF THE NATIONAL TRANSMISSION CORPORATION (TRANSCO) TO MANILA ELECTRIC COMPANY (MERALCO), AS COVERED BY A CONTRACT TO SELL, WITH PRAYER FOR PROVISIONAL AUTHORITY, Manila Electric Company (MERALCO), Applicant"
Application for Authority to Retire the Morong Substation Located at Morong, Province of Rizal, the Gaya-Gaya Substation Located at San Jose Del Monte, Province of Bulacan and the Mauban Substation Located at Mauban, Province of Quezon, and to Withdraw from the Service Certain Equipment and Machinery Installed in the Said Substations, with Prayer for Provisional Authority February 25, 2010
In compliance with the Energy Regulatory Commission's Order dated February 15, 2010 requiring MERALCO to inform its customers of the scheduled hearing in ERC CASE NO. 2009-118 MC entitled: "APPLICATION FOR AUTHORITY TO RETIRE THE MORONG SUBSTATION LOCATED AT MORONG, PROVINCE OF RIZAL, THE GAYA-GAYA SUBSTATION LOCATED AT SAN JOSE DEL MONTE, PROVINCE OF BULACAN AND THE MAUBAN SUBSTATION LOCATED AT MAUBAN, PROVINCE OF QUEZON, AND TO WITHDRAW FROM THE SERVICE CERTAIN EQUIPMENT AND MACHINERY INSTALLED IN THE SAID SUBSTATIONS, WITH PRAYER FOR PROVISIONAL AUTHORITY, Manila Electric Company (MERALCO), Applicant".
2009 ERC Postings
Application for the Approval of the Agreement for the Supply of Electricity and Contract for Electric Service Entered into by MERALCO with NPC SPUG -LUZON and NPC SPUG -MQNL, Respectively, Pursuant to ERC Resolution No.1, Series of 2009, with Prayer for Provisional Authority December 22, 2009
In compliance with the Energy Regulatory Commission's Order dated December 15, 2009 requiring MERALCO to inform its customers of the scheduled hearing in ERC Case No. 2009-087 RC entitled: "IN THE MATTER OF THE APPLICATION FOR THE APPROVAL OF THE AGREEMENT FOR THE SUPPLY OF ELECTRICITY AND CONTRACT FOR ELECTRIC SERVICE ENTERED INTO BY MERALCO WITH NPC SPUG -LUZON AND NPC SPUG -MQNL, RESPECTIVELY, PURSUANT TO ERC RESOLUTION NO.1, SERIES OF 2009, WITH PRAYER FOR PROVISIONAL AUTHORITY, Manila Electric Company (MERALCO), Applicant"
Petition for the Amendment of ERC Resolution No. 16, Series of 2009, entitled "A resolution adopting the rules governing the Automatic Cost Adjustment and True-Up Mechanisms and Corresponding Confirmation Process for Distribution Utilities November 11, 2009
In compliance with the Energy Regulatory Commission's Order dated November 9, 2009 requiring MERALCO to inform its customers of the scheduled hearing in ERC Case No. 2009-013 RM entitled: "IN THE MATTER OF THE PETITION FOR THE AMENDMENT OF ERC RESOLUTION NO. 16, SERIES OF 2009, ENTITLED "A RESOLUTION ADOPTING THE RULES GOVERNING THE AUTOMATIC COST ADJUSTMENT AND TRUE-UP MECHANISMS AND CORRESPONDING CONFIRMATION PROCESS FOR DISTRIBUTION UTILITIES, Manila Electric Company (MERALCO), Petitioner".
Application for Authority to implement the following electric capital projects: (1) Replacement of power transformer bank no. 1 at Sta. Mesa Substation; (2) Replacement of power transformer bank no. 5 at Balintawak Substation; (3) Uprating of power transformer bank no. 1 at Sta. Rosa Substation; (4) Expansion of the First Philippine Industrial Park (FPIP) 115 kv - 34.5 Kv substation; and (5) Construction of Laguna International Industrial Park-Rohm Electronics Philippines, Inc. (LIIP-ROHM) 115 Kv line, with Prayer for Provisional Authority October 30, 2009
In compliance with the Energy Regulatory Commission's Order dated October 26, 2009 requiring MERALCO to inform its customers of the scheduled hearing in ERC Case No. 2009-068 MC entitled: "IN THE MATTER OF THE APPLICATION FOR AUTHORITY TO IMPLEMENT THE FOLLOWING ELECTRIC CAPITAL PROJECTS: (1) REPLACEMENT OF POWER TRANSFORMER BANK NO. 1 AT STA. MESA SUBSTATION; (2) REPLACEMENT OF POWER TRANSFORMER BANK NO. 5 AT BALINTAWAK SUBSTATION; (3) UPRATING OF POWER TRANSFORMER BANK NO. 1 AT STA. ROSA SUBSTATION; (4) EXPANSION OF THE FIRST PHILIPPINE INDUSTRIAL PARK (FPIP) 115 KV - 34.5 KV SUBSTATION; AND (5) CONSTRUCTION OF LAGUNA INTERNATIONAL INDUSTRIAL PARK-ROHM ELECTRONICS PHILIPPINES, INC. (LIIP-ROHM) 115 KV LINE, WITH PRAYER FOR PROVISIONAL AUTHORITY, Manila Electric Company (MERALCO), Applicant".
Application for Approval of: a) Maximum Average Price (MAP) for the Regulatory Year 2010 (RY 2010); and b) Translation of the MAP for RY 2010 Into a Distribution Rate Structure for its Various Customer Classes, with Prayer for Provisional Authority September 1, 2009
In compliance with the Energy Regulatory Commission's Order dated August 24, 2009 requiring MERALCO to inform its customers of the scheduled hearing in ERC Case No. 2009-057 RC entitled: "In the Matter of the Application for Approval of: a) Maximum Average Price (MAP) for the Regulatory Year 2010 (RY 2010); and b) Translation of the MAP for RY 2010 Into a Distribution Rate Structure for its Various Customer Classes, with Prayer for Provisional Authority, Manila Electric Company (MERALCO), Applicant".
Application to Confirm the Transmission Cost Over - and Under - Recoveries and Offset the Net Transmission Cost Over - Recoveries with the Transmission Cost Under - Recoveries Applied for Under ERC Case No. 2007-147 RC, Including Carrying Cost, with Prayer for Provisional Authority September 1, 2009
In compliance with the Energy Regulatory Commission's Order dated August 24, 2009 requiring MERALCO to inform its customers of the scheduled hearing in ERC Case No. 2009-054 RC entitled: "In the Matter of the Application to Confirm the Transmission Cost Over - and Under - Recoveries and Offset the Net Transmission Cost Over - Recoveries with the Transmission Cost Under - Recoveries Applied for Under ERC Case No. 2007-147 RC, Including Carrying Cost, with Prayer for Provisional Authority, Manila Electric Company (MERALCO), Applicant".
Application for Approval of a.)the Memorandum Of Agreement (MOA) by and between CIP2 Power Corporation (CIPP), Carmelray JTCI Corporation (CJC) and Manila Electric Company (MERALCO); b) MOA between CJC and MERALCO; c) MOA between CIPP and MERALCO; d) Deed Of Sale of land between CJC and MERALCO; e) Asset purchase agreement between CIPP and MERALCO; and the construction of a 115 kV-13.8 kV substation within Carmelray Industrial Park II August 26, 2009
In compliance with the Energy Regulatory Commission's Order dated August 11, 2009 requiring MERALCO to inform its customers of the scheduled hearing in ERC Case No. 2009-053 MC entitled: "In the Matter of the Application for Approval of a.)the Memorandum Of Agreement (MOA) by and between CIP2 Power Corporation (CIPP), Carmelray JTCI Corporation (CJC) and Manila Electric Company (MERALCO); b) MOA between CJC and MERALCO; c) MOA between CIPP and MERALCO; d) Deed Of Sale of land between CJC and MERALCO; e) Asset purchase agreement between CIPP and MERALCO; and the construction of a 115 kV-13.8 kV substation within Carmelray Industrial Park II, Manila Electric Company (MERALCO), Applicant".