Maintenance Schedule · Archive

August 7 - 8, 2024 - Laguna (Sta. Cruz)

Maintenance Schedule

BETWEEN 11:45PM AND 11:59PM (WED., 08/07/24) AND THEN BETWEEN 6:00AM AND 6:15AM (THU., 08/08/24) – THE WHOLE OF CIRCUITS STA. CRUZ 34WF AND 35WF

Portion of P. Guevarra Ave. from Meralco – Sta. Cruz substation in Bgy. Pagsawitan to and including Bgys. Santisima Cruz, Umboy, Calios, Pagsawitan, San Pablo Sur, Sto. Angel Central, Sto. Angel Norte, Sto. Angel Sur and Town Proper.

Portion of Quezon Ave. and Bagumbayan Road from P. Guevarra Ave. in Town Proper to National Highway (Sta. Cruz – Pila Road) including Bgys. Bagong Bayan (Bagumbayan), Bubukal, Calios, Labuin, Patimbao, Sto. Angel Central and Sto. Angel Sur.

Reason

Preventive maintenance and testing works inside Meralco - Sta. Cruz substation.

Need help?

Visit Help

Open original image (new tab)