Energy Solutions Finder
Coming soon
Compare your energy goals and identify the Meralco program or service that best fits what you need.
Business
Match your contract, operating hours, equipment, and energy source to what your business actually needs.
Start with the solution that matches your goal. Explore our available guides below.
Coming soon
Compare your energy goals and identify the Meralco program or service that best fits what you need.
On this page
Jump directly to the guidance that matches your site, operating profile, energy source, or equipment priorities.
Power Consult and Power Match
Planning early can reduce avoidable construction work, support timely energization, and keep contracted capacity aligned with your actual demand.
Bring Meralco into site planning before electrical facilities are finalized. The review can cover the proposed location, electrical load, service requirements, and the facilities needed to connect safely.
Explore Power ConsultCompare actual peak demand with your contracted capacity. Capacity that is consistently too high can leave facilities underused; capacity that is too low can overload facilities and create safety risks.
Explore Power MatchIf your site relies on generator sets, Power Gain can help assess a grid connection for a scalable primary supply while generators remain available for appropriate backup use.
Explore Power Gain
Rates and operating profile
Your bill and load profile show when and how your business uses electricity. That evidence should guide any change in contract or pricing program.
This alternative pricing scheme is designed for businesses whose operations already run, or can be shifted, into approved off-peak periods. Eligibility, rates, fees, and savings depend on current ERC-approved terms and your load profile.
Ask for a program assessmentReview actual demand, minimum billing demand, load factor, and power factor together. My Meralco support can help identify whether operating changes or a contract review should come first.
Interruptible Load ProgramEligible businesses may also compare retail electricity or renewable-energy suppliers through regulated customer-choice programs.
Explore customer choice
Solar and distributed energy
System size, ownership, and whether electricity will be exported determine which Meralco and ERC process applies.
For eligible renewable-energy systems with a capacity of 100 kW or less, a bi-directional meter records electricity imported from Meralco and eligible excess electricity exported to the grid for bill credits.
Review the current Net Metering guidanceLarger or differently structured installations may follow the exporting DER or non-exporting DER path. Meralco evaluates the proposed interconnection so the facility can operate safely with the distribution system.
Learn more about Distributed Energy Resources
Power Ideas
Start with operating systems, preventive maintenance, and equipment choices that have the greatest effect on your electricity use.
Assess route requirements, charging windows, site capacity, and charger installation together. A fleet plan should account for both vehicles and the electrical facilities that will support them.
Prepare recent bills, operating hours, planned equipment or expansion, current contracted capacity, and any load-profile data already available. This gives the team a practical starting point.
No. Results depend on your load profile, contract, equipment, operating schedule, program rules, and investment cost. Ask for an assessment based on your own data before deciding.
Power Consult
Meralco can help you review the energy choices that fit your site, schedule, and growth plans.
Open My Meralco