Maintenance Schedule · Archive
May 29, 2025 - Laguna (Sta. Cruz)
Maintenance Schedule
BETWEEN 2:30AM AND 3:30AM AND THEN BETWEEN 6:30AM AND 7:30AM – THE WHOLE OF CIRCUITS STA. CRUZ 322WF, 34WF, AND 35WF
Bgys. Bagumbayan, Bubukal, Calios, Duhat, Gatid, Labuin, Pagsawitan, Palasan, Patimbao, San Pablo Sur, Sto. Angel Central, Sto. Angel Norte, Sto. Angel Sur and Town Proper.
Reason
NGCP maintenance works along NGCP Lumban 52KY – Caliraya 51CL transmission lines and inside NGCP Caliraya substation.