Maintenance Schedule · Archive
July 9 – 10, 2025 Rizal Province (Cainta)
Maintenance Schedule
BETWEEN 11:30PM (WED., 07/09/25) AND 4:30AM (THU., 07/10/25) – PORTION OF CIRCUITS CAINTA 44XG AND 42XG
Portion of Snap Dragon St. from Magnolia St. to and including Aster, Camia, Carnation, Catleya, Daffodil, Dahlia, Daisy, Dama De Noche, Fancy, Gladiola, Jasmin, Lily, Mariposa, Orchids, Romeo Thaddeus, Rose, Sampaguita, Tulip, Verbena, Violet, Yakal and Zinnia Sts. in Midtown Subd.; Blocks 1, 2, 3, 4, 5, 6, 8, 10 & A, Lower Eastment, Lower Special Block and Spl. Block Sts. in Kabisig Floodway Subd.; Block 1 St. in Lower East Bank Subd.; Carnation, Everlasting, Lower Special Block and Sampaguita Sts. in PFCI Floodway Subd.; Leticia Ville III Subd. and Madera Homes II Subd. in Bgy. San Andres.