Maintenance Schedule · Archive
July 19, 2025 Bulacan (Meycauayan City)
Maintenance Schedule
BETWEEN 9:00AM AND 2:00PM – PORTION OF CIRCUIT MEYCAUAYAN 42YM
Portion of Aluminum St. from Muralla St. to and including Advance Uniflex Technology Inc., Arlo Aluminum Factory and OTO Steel Mfg. Corp. inside Muralla Industrial Park in Bgys. Perez and Iba.
Reason
Line reconductoring works and replacement of poles in Muralla Industrial Park, Bgys. Perez and Iba in Meycauayan City, Bulacan.