December 11, 2018 - Batangas (Sto.Tomas)

Maintenance Schedule

BETWEEN 7:00AM AND 7:59AM AND THEN BETWEEN 2:01PM AND 3:00PM – THE WHOLE OF CIRCUIT CALAMBA 31XO

Portion of Calamba – Los Baños National Highway (Manila South Road) from Taklaban St. in Bgy. Real to Bucal Barangay Road in Bgy. Bucal, Calamba Laguna.

Portion of Calamba – Los Baños National Highway (Manila South Road) from Camp Eldridge in Bgy. Lalakay, to Batong Malake Junction Road in Bgys. Años and Batong Malake, Los Baños, Laguna.

 BETWEEN 1:00PM AND 2:00PM – THE WHOLE OF CIRCUIT MAKBAN 56MB

St. Thomas Paper Mill in Bgy. San Felix, Sto. Tomas, Batangas.

 

Reason

NGCP repair work along Bay - Calamba 69kV transmission lines.