Enabled by law
Republic Act No. 9513 established the Net Metering pathway for qualified on-site renewable-energy systems.
Use renewable energy at your property, connect safely to the Meralco grid, and receive bill credits for eligible excess electricity you export.
Your system supplies the property first while it is generating.
Surplus electricity can flow through the approved connection to the grid.
The Meralco grid supplies the property when renewable generation is not enough.
Eligible exports earn peso credits under the applicable Net Metering rules.
Net Metering is an arrangement under the Renewable Energy Act that lets a qualified customer operate an on-site renewable-energy system in parallel with the distribution grid. The property uses the electricity it produces first. Eligible excess electricity is recorded when it is exported to the grid and earns a peso credit on the customer’s bill.
A bi-directional meter records imports from Meralco and exports from the approved system separately. Imported electricity and exported electricity use different rate components, so an exported kilowatt-hour is not exchanged one-for-one at the full retail rate.
Republic Act No. 9513 established the Net Metering pathway for qualified on-site renewable-energy systems.
The program ceiling is not more than 100 kW per qualified small generation entity. Final approval depends on the proposed system and local network conditions.
Eligible excess electricity exported through the approved setup earns peso credits under the applicable monthly export-credit rate.
Use the previous and next buttons, or the left and right arrow keys while the carousel is focused, to browse the explanations. Use Home or End to jump to the first or last item.
Technical review, inspection, approved metering, testing, and commissioning help the system operate safely with the grid.
Approved protection and a technical assessment help prevent unacceptable power-quality or reliability effects.
Using renewable electricity on-site can reduce dependence on grid-supplied energy while the system is generating.
On-site use reduces imported electricity, while eligible exports may earn credits. Results vary with use, weather, design, rates, and maintenance.
Residential, business, industrial, and government customers may apply, subject to current program and technical requirements.
The applicant should have no unsettled or outstanding Meralco obligation at the time of application.
The electric service that will host the installation should be registered under the applicant’s name or supported by the required authorization.
The proposed equipment, capacity, protection, service entrance, permits, and interconnection must pass the applicable review.
Work with an experienced provider that follows safety standards, supplies complete equipment information, and offers dependable support.
Contact Meralco early and do not export or operate in parallel until the required review, metering, testing, and commissioning are complete.
Use the latest application form and checklist, then gather account, equipment, provider, permit, and representative information that applies.
Renewable energy can supply homes and businesses with cleaner on-site electricity. Net Metering adds a safe, approved way for qualified customers to export eligible excess generation and receive bill credits.
Review the application process
Electricity produced by the renewable-energy system supplies the property first. When generation is higher than demand, eligible excess energy can be exported. When generation is lower, the property continues to import electricity from Meralco.
A bi-directional meter records electricity delivered by Meralco and eligible electricity exported by the approved system as two separate energy flows. A separate REC meter may be used to measure gross renewable generation when selected.
Use the previous and next buttons, or the left and right arrow keys while the carousel is focused, to browse the explanations. Use Home or End to jump to the first or last item.
Review which appliances and equipment run during daylight so the proposed capacity reflects realistic on-site use and avoids over- or under-sizing.
Check roof condition, structural capacity, orientation, tilt, and shading because each affects safety and system performance.
Choose a qualified provider that follows technical standards, documents the equipment correctly, and offers reliable after-sales support.
Review the latest checklist and coordinate early with the local government unit for permits and the Certificate of Final Electrical Inspection.
An improperly installed or untested system can cause faults that damage renewable-energy equipment, appliances, or connected electrical facilities.
Non-compliant wiring, protection, or installation work can create electrical fire and electrocution hazards.
A system without correct anti-islanding and isolation protection can energize lines during an outage or maintenance activity.
An incorrect interconnection can create voltage, power-quality, or service disturbances that affect the property and nearby customers.
Getting started and eligibility
Process and application requirements
Technical checks
Meters, billing, and credits
Customer responsibilities and compliance
Costs and fees
Safety and protection
Other questions
For a customer-owned system that generates electricity for your own use without exporting, review the SGF Zero Export Solar System or Micro Solar System guidance. These programs have their own system, safety and notification requirements.
Review the six application stages, download the current forms, and check the requirements that apply to your property and proposed system.
Open the application guide